Skip to main content
UCRDharikhedaAMS-III.H

Wastewater Methane Recovery Biogas Project at Dharikheda, Gujarat

UCR-4 ↗

#97of 111 in Biogas#234of 421 in Universal Carbon Registry (UCR)#20of 22 in AMS-III.H

3.3/ 10
Integrity
4.5
Transparency
1.5
Claim Safety
4.0
Documentation
2.5

Audit Analysis

The Dharikheda wastewater biogas project uses a standardised methodology (AMS-III.H / AMS-I.C) with an investment additionality test, but the available record contains only the PDD — no verification report, monitoring report, or VVB documentation. The claimed 58,809 tCO₂e for the ~20-month crediting period cannot be independently confirmed, and key integrity elements (VVB confirmation, buffer pool, verified ERR) are absent from the extracted data.

Red Flags

  • No verification report or monitoring report in the available record; the 58,809 tCO₂e claim is unverified
  • VVB identity and verification status are not stated in any available document
  • Project-specific baseline with no reassessment date recorded
  • Only a single document (PDD, dated 2021-10-17) underpins the entire assessment

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Investment test in PDD; VVB confirmation not in record

Permanence

Avoidance-type biogas; no reversal events reported

Leakage

Justified as not applicable; no quantified assessment

Baseline

Project-specific; no reassessment date recorded

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-20AMS-III.H, AMS-I.C

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents