Wastewater Treatment and Biogas Recovery Project, SDDPL, Baramati, Maharashtra, India
#102of 111 in Biogas#375of 421 in Universal Carbon Registry (UCR)#22of 22 in AMS-III.H
Audit Analysis
This biogas recovery project in Baramati, India, uses a recognised AMS methodology and reports a 10-year crediting period with a claimed 14,775 tCO₂e, but the available record contains only a single PDD with no verification, monitoring, or VVB reports. The absence of any documented additionality test, verified ERR figure, or permanence mechanism represents a fundamental evidence gap that prevents a confident quality assessment.
Red Flags
- No additionality test type or VVB verification of additionality is documented in the available record — a fundamental requirement for any carbon credit project
- No verified ERR figure exists; only the ex-ante claim of 14,775 tCO₂e is available, making over- or under-crediting impossible to assess
- Only a single PDD (dated 2024-03-02) is in the record; no verification reports, monitoring reports, or VVB reports were found
- No buffer pool or permanence mechanism is documented, and reversal events are not stated rather than confirmed absent
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB verification found
No buffer pool; reversal events not stated
0% deemed negligible; thin justification
Project-specific; no reassessment date
Mentioned and benefit sharing described; FPIC and grievance
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →