Henan Yinge Industrial Investment Corporation Wastewater Treatment and Methane Recovery Project
#72of 110 in Water#755of 1084 in China#994of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM methane-recovery project from wastewater treatment with a VVB-verified investment additionality test and a measured baseline, but undermined by an unaddressed leakage deduction, a baseline methodology contradiction between the PDD and validation report, and a substantial list of PDD corrections. The project delivered approximately 99% of its pro-rata expected reductions for the monitored period, but key transparency data (verified ERR, FNRB, usage monitoring) are absent from the extracted record.
Red Flags
- Leakage deduction of 0% with the later monitoring report (Aug 2013) stating leakage was 'not addressed,' contradicting the earlier monitoring report (Jun 2012) which indicated it was quantified
- Baseline methodology contradiction: the validation report (Nov 2010) describes a measured baseline, while the PDD (Mar 2013) describes a modeled baseline
- No buffer pool or reversal-risk mitigation documented for a 10-year crediting period
- 17 material findings and 13 corrective actions identified during validation, including incorrect installed capacity, missing component parameters, and expired methodology versions
- Total verified ERR figure is not present in the extracted record, preventing independent cross-check of claimed reductions
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 81,895 | 0 | 81,895 | |
| 2014 | 42,795 | 0 | 42,795 | |
| Total | 124,690 | 0 | 124,690 |
Risk Indicators
VVB-confirmed investment test
no reversal data
0% deduction, not addressed (later report)
Project-specific; measured vs modeled conflict
Mentioned; no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →