Biogas recovery and electricity generation from Mzar Wastewater treatment plant, Morocco
#80of 268 in Biogas#6of 12 in Morocco#732of 1459 in CDM (UNFCCC)#18of 55 in AMS-III.H
Audit Analysis
A CDM biogas-recovery project at a Moroccan wastewater treatment plant with VVB-confirmed additionality and a reputable verifier (SGS UK), but limited by a project-specific modeled baseline, a thin 0% leakage justification, and the absence of any monitoring-period data in the extracted record. The low extraction confidence and two inter-document contradictions (crediting period and baseline type) reduce confidence in the overall data picture.
Red Flags
- Crediting period contradicts between the PDD (2018-2025) and the validation report (2016-2022); the validation report is privileged as the VVB's authoritative assessment, but the discrepancy undermines confidence in the project's temporal scope.
- Leakage deduction of 0% is justified only as 'deemed negligible' with no quantified analysis, which is thin for a wastewater biogas project where displaced methane or changes in treatment practice could shift emissions.
- Grid emission factor of 0.735 tCO₂/MWh is drawn from 2007 data; no updated or jurisdictional grid factor is cited in the extracted record.
- No monitoring-period data, no buffer pool, and no reversal-event record are present in the extracted documents, leaving permanence and delivery performance unverified.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
no reversal data
0% deduction, thin justification
Project-specific, modeled, 2007 grid EF
Mentioned; FPIC and grievance not stated
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.