CDMMethane avoidanceIranAMS-I.C

Biogas recovery and CHP production in modules 1 & 2 of West Tehran Wastewater Treatment Plant

CDM-10206 ↗

#92of 268 in Biogas#3of 5 in Iran#811of 1459 in CDM (UNFCCC)#33of 115 in AMS-I.C

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

A CDM biogas-recovery and CHP project at the West Tehran Wastewater Treatment Plant with VVB-confirmed additionality via an investment test, but a project-specific modeled baseline, a 0% leakage deduction justified only as 'deemed negligible' (contradicted by an appendix suggesting quantification), and a validation report that flagged 16 material findings (8 CLs, 8 CARs) before resolution. No monitoring-period data, FNRB method, or usage-rate figures were found in the extracted record, limiting the ability to verify actual delivery against the ex-ante estimate of 72,677 tCO₂e.

Red Flags

  • Validation report (Jan 2017) recorded 8 compliance-level findings and 8 corrective-action requests covering baseline identification, investment-analysis inputs, monitoring locations, and UNFCCC incompleteness — a high volume of issues for a single validation cycle
  • Leakage justification is contradictory: the validation report states 'deemed negligible' while an appendix (5 days earlier) indicates the leakage was 'quantified'; the 0% deduction rests on the weaker justification
  • No monitoring-period data, FNRB method, or usage-rate figures were found in any extracted document, so actual credit delivery cannot be independently verified against the 72,677 tCO₂e ex-ante estimate
  • Baseline is project-specific and modeled rather than jurisdictional or standardised, increasing sensitivity to input assumptions

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test; capture not legally required

Permanence

no reversal e

Leakage

0% deduction, 'deemed negligible' contradicted by appendix s

Baseline

Project-specific modeled baseline; reassessment not yet due

Safeguards

Safeguards mentioned and benefit-sharing described, but FPIC

Double-claim

CORSIA eligibility and CCP status not stated in available do

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS-I.C, AMS-III.H

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents