Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-AMS-I-C-GRID-EF
AMS-I.C — Thermal energy production with or without electricity
About this methodology
Projects supply heat from renewable sources, sometimes together with electricity or cooling. The method measures emissions avoided by replacing fossil-fuel energy supplies.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 22.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Heat and electricity
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Gold Standard (GS) (120 projects)
- Verra (VCS) (85 projects)
- Global Carbon Council (GCC) (19 projects)
4 more
- Universal Carbon Registry (UCR) (19 projects)
- American Carbon Registry (ACR) (1 project)
- CerCarbono (CC) (1 project)
- International Carbon Registry (ICR) (1 project)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Deductions that can apply
No additionality test in the documents (renewable energy) A-TEST-NOT-STATED
Renewable energy, power generation and supply: the documents read state no additionality test. A test that the documents do not name is a different case. It takes no points. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it in some cases (AMS-I.C v22 §5.4, p. 26). Our current method does not assess it. CM-F-AMS-I-C-LEAKAGE
- not assessed
Sustainability of the feedstock: the methodology sets rules for it (AMS-I.C v22 para 11, p. 6). Our current method does not assess it. CM-F-AMS-I-C-FEEDSTOCK-SUSTAINABILITY
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-I-C-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-REGULATORY-SURPLUSNo legal requirement for the activity
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
All 22 versions · current v22.0
-
v22.0adopted 11 Mar 2022currentsource
Indicate the emission sources that are relevant in the calculation of project emissions associated with biomass and biomass residues, in line with the “TOOL16: Project and leakage emissions from biomass” (version 05.0).
-
v21.0adopted 14 Jun 2019source
Include non-binding best practice examples and editorial corrections.
-
v20.0adopted 1 Jun 2014source
To extend the applicability of the methodology to trigeneration projects and include a reference to tool “Project emissions from cultivation of biomass”. Further clarifies baseline and monitoring procedures taking into account …
-
v19.0adopted 3 Jun 2011source
To simplify the monitoring requirements for quantity, net calorific value and moisture content of biomass; and include an additional scenario for cogeneration project activities.
-
v18.0adopted 17 Sept 2010source
To include a procedure for determining baseline efficiency for a new cogeneration system.
-
v17.0adopted 28 May 2010source
To include additional guidelines on determining baseline emissions for project activities involving fuel switch from fossil fuel to biomass in thermal generating equipment. An applicability criterion on the use of biomass briquette has …
-
v16.0adopted 4 Dec 2009source
To expand the applicability of the methodology to biomass based cogeneration project activities supplying surplus electricity to a grid.
-
v15.0adopted 17 Jul 2009source
To: (a) Include simplified procedures for determining efficiency of small thermal appliances used in household or commercial applications (<45kW thermal capacity); and (b) Include procedures for the estimation of baseline emission factors …
-
v14.0adopted 25 Mar 2009source
-
v13.0adopted 14 Mar 2008source
To expand its applicability to include additional baseline scenarios (e.g. steam/heat produced from renewable biomass and electricity imported from the grid and/or generated in a captive plant in the baseline, while in the project case …
-
v12.0adopted 27 Jul 2007source
-
v11.0adopted 22 Jun 2007source
To clarify the monitoring of biomass in project activities that apply these methodologies which is consistent with monitoring of biomass in the approved methodology AMS-I.D.
-
v10.0adopted 4 May 2007source
To provide options for baseline calculations when cogeneration from fossil fuels is the baseline activity thereby broadening the applicability of AMS-I.C.
-
v09.0adopted 15 Dec 2006source
To align the guidance on capacity addition and retrofit activities to be consistent with the revisions of AMS-I.D.
-
v08.0adopted 24 Feb 2006source
To: (i) Include provisions for retrofit and renewable energy capacity additions as eligible activities; (ii) Provide clarification for baseline calculations under category I.D; and (iii) Provide clarification on the applicability of …
-
v07.0adopted 25 Nov 2005source
References to “non-renewable biomass” in Appendix B deleted.
-
v06.0adopted 30 Sept 2005source
Guidance on consideration of non-renewable biomass in Type I methodologies, thermal equivalence of Type II GWhe limits included.
-
v05.0adopted 25 Feb 2005source
Guidance on ‘capacity addition’ and ‘cofiring’ in Type I methodologies and monitoring of methane in AMS-III.D included.
-
v04.0adopted 22 Oct 2004source
AMS-II.F was adopted; leakage due to equipment transfer was included in all Type I and Type II methodologies.
-
v03.0adopted 14 Jun 2004source
New methodology AMS-III.E was adopted.
-
v02.0adopted 28 Nov 2003source
Definition of build margin included in AMS-I.D., minor revisions to AMS I.A, AMS-III.D, AMS-II.E.
-
v01.0adopted 21 Jan 2003source
Initial adoption. The Board at its seventh meeting noted the adoption by the Conference of the Parties (COP), by its decision 21/CP.8, of simplified modalities and procedures for small-scale CDM project activities (SSC M&P).
Top projects using AMS-I.C
This page ranks projects using AMS-I.C by their CarbonMeld document-based ratings. The rank compares project ratings; it is not a rating of the methodology itself.
8 rated projects of the 739 tracked in this methodology · average rating 4.4/10 · ranked by CarbonMeld's document-based rating: additionality, quantification, permanence (where carbon is stored) and claim safety.
262 analysed project pages, A–Z →
Which registries list projects under AMS-I.C?
In CarbonMeld's data, AMS-I.C projects are on 8 registries: CDM (493), Gold Standard (120) and Verra (85), and 5 more. Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 493 | 200 | See the list |
| Gold Standard (GS) | 120 | 103 | See the list |
| Verra (VCS) | 85 | 22 | See the list |
| Global Carbon Council (GCC) | 19 | 0 | See the list |
| Universal Carbon Registry (UCR) | 19 | 11 | See the list |
| American Carbon Registry (ACR) | 1 | 0 | See the list |
| CerCarbono (CC) | 1 | 0 | See the list |
| International Carbon Registry (ICR) | 1 | 1 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis, so they can be larger than the ranking below. «Registered» counts the records whose current registry status is «registered», as last read (25 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- 4 4.5
- 5 4.5
- 6 4.5
- 7 4.2
- 8 3.5