Skip to main content
CDMMethane avoidanceHondurasAMS-III.H

Cervecería Hondureña Methane Capture Project

CDM-0896 ↗

#6of 20 in Honduras#823of 1459 in CDM (UNFCCC)#20of 55 in AMS-III.H

5.0/ 10
Integrity
5.2
Transparency
4.8
Claim Safety
5.8
Documentation
3.8

Audit Analysis

The Cervecería Hondureña Methane Capture Project is a CDM-registered brewery wastewater biogas project with a combined additionality test and a project-specific modeled baseline. Key weaknesses include a 0% leakage deduction with contradictory justifications across documents, the absence of a buffer pool, and low extraction confidence in the available record. The project completed its 7-year crediting period (2010–2017) with 57,414 tCO₂e verified, but documentation gaps and the unresolved leakage question limit confidence in the credit quality.

Red Flags

  • Leakage deduction of 0% with contradictory justifications: the PDD (2011) states leakage was 'deemed negligible' while the validation report (2012) records it as 'not addressed' — the VVB did not independently confirm the negligible-leakage claim
  • No buffer pool is recorded for the project, leaving no safety margin against potential reversal if the biogas capture system is decommissioned or underperforms
  • Minimum extraction confidence is rated low, and one of the four source documents is listed as 'unknown', reducing reliability of the extracted record
  • FPIC and grievance mechanism fields are not stated in any available document, despite safeguards being mentioned in general terms

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test present; VVB confirmation not explicitly recor

Permanence

no reversal events reported but no safety ma

Leakage

0% deduction; justification contradicted between PDD and val

Baseline

Project-specific modeled baseline; last reassessed 2012

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27AMS III.H. – Methane recovery in wastewater treatment; AMS I.C. – Thermal energy production with or without electricity

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents