Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN
Rankings · methodology

Top AM0080 projects

7 rated projects of the 12 tracked in this methodology · average score 5.4/10 · ranked by CarbonMeld's document-based assessment scores across all four dimensions: integrity, transparency, claim safety and documentation.

← All leaderboards · Full database

What you're looking at

This page ranks projects using AM0080 by their CarbonMeld document-based assessment scores. The rank compares project assessments; it is not a rating of the methodology itself.

CarbonMeld scores assess integrity, transparency, claim safety and documentation using project documents. Higher scores indicate stronger evidence under this framework. How to read CarbonMeld scores.

Project names, codes and registry status come from official registry records. Open a project dossier for its source record. Registry / standard: CDM / UNFCCC · Verra / VCS .

AM0080: Mitigation of greenhouse gases emissions with treatment of wastewater in aerobic wastewater treatment plants

Methodology issuer: CDM / UNFCCC · Official methodology page.

Wastewater · Emission reductions

Projects build aerobic treatment plants for domestic or industrial wastewater, with arrangements for handling the sludge. The method measures greenhouse gas reductions compared with anaerobic lagoon treatment.

Source for the activity description

Version 1.0 · Active at CDM / UNFCCC · status verified on

Version and status refer to the methodology at its issuer. Individual projects may use different versions; these facts do not establish credit eligibility in other programs.

#1Lingbi County Wastewater Treatment Plant ProjectVCSChinaWaterRegistry: Registered7.7/10▲+1.9#2Marrakesh Wastewater Treatment Plant (WWTP) with biogas recovery for cogenerationCDMMoroccoBiogasRegistry: Registered6/10#3Yunshui Wastewater Treatment Plant Project in Guangdong ProvinceVCSChinaWaterRegistry: Registered5.6/10▲+1.8
  1. 45.3▼-0.1
  2. 55.2▼-0.1
  3. 6
    Bishuiyuan Wastewater Treatment Plant ProjectVCSChinaWaterRegistry: Registered
    5▼-0.9
  4. 73.3

Rank is by document-based assessment score only. The registry status shown next to each project is a separate fact: inclusion in this ranking is not a statement of current validity or credit eligibility — projects suspended, withdrawn or terminated by their registry can still appear, with their status labelled. Read the methodology.