Yunshui Wastewater Treatment Plant Project in Guangdong Province

VCS-2938 ↗

3.8 / 10
Integrity
4.8
Transparency
2.9
Claim Safety
3.8
Documentation
2.7

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using a combined test, which supports the project case.

missing The issuance report records numerous material findings and unresolved baseline and monitoring clarifications, including missing calculation details and baseline demonstrations.

Transparency

missing The monitoring and issuance record shows a large discrepancy between claimed and verified emission reductions, which reduces reporting clarity.

inferred The VVB is named and the monitoring period is stated, but key monitoring details such as the usage monitoring method are not found in the extracted record.

Claim Safety

missing The gap between claimed and verified emission reductions is very large, suggesting elevated over-crediting risk.

inferred The project is marked CORSIA-eligible, but CCP status is not stated and the leakage rationale is only described as negligible.

Documentation

missing The extraction confidence is low, and one or more key documents were poorly readable.

missing The issuance record lists 32 corrective action requests and 10 clarification requests, indicating substantial documentation weaknesses.

Detailed Analysis

Integrity

The project’s additionality case is stronger than average because the issuance record says the VVB confirmed it through a combined test. However, integrity is weakened by the issuance report’s many material findings, including missing baseline demonstrations, incomplete investment-analysis support, and missing monitoring details. Leakage is treated as negligible with a 0% deduction, but the contradiction record shows an earlier document saying leakage was not addressed, so I privileged the later issuance record because it is more recent and more specific.

Transparency

Transparency is limited by the large difference between claimed and verified emission reductions, with 794,043 claimed versus 110,002 verified. The monitoring period and VVB are identified, but the extracted record does not state the usage monitoring method, and the low extraction-confidence flag suggests at least one key source was hard to read. The registry status is clear, but the overall reporting trail still looks incomplete.

Claim Safety

Claim safety is weakened by the very large claimed-versus-verified gap, which raises over-crediting concerns. The project is marked CORSIA-eligible, but CCP status is not stated, so dual-market risk is not fully resolved from the available record. The baseline is project-based rather than a more standardized jurisdictional approach, and the leakage justification is only summarized as negligible.

Documentation

Documentation quality is poor relative to what would be expected for a high-confidence issuance file. The record shows low extraction confidence, only one evidence document explicitly listed in the extracted set, and a long list of corrective actions and clarifications, including missing equipment, stakeholder, and calculation details. The crediting period is long and the monitoring period is recent, but the breadth of unresolved issues keeps the documentation score low.

Overall

Overall confidence is constrained by the low extraction quality and the many unresolved findings in the issuance record. I privileged the later issuance document over the earlier leakage note because it is more recent and appears to be the final verification/issuance source, but the contradiction still lowers reliability. The project is not a clear reject on integrity because additionality was VVB-confirmed, yet the large claimed-to-verified gap and extensive corrective actions keep the overall assessment cautious. The documentation score is below 3.0, so transparency would be capped further in a downstream rules engine, and the integrity score remains above 4.0 so the overall cap does not apply.

Audit Analysis

The project has some positive signals, including VVB-confirmed additionality and a stated leakage deduction of 0%, but the issuance record also shows many unresolved documentation issues and a low extraction-confidence warning. The very large gap between claimed and verified emission reductions, plus multiple corrective actions and a contradiction on leakage treatment, materially weaken confidence in the credits.

Project Description

Proponent: Yunshui Guangdong Environmental Protection Co., Ltd. Protocol categories: Waste handling and disposal Protocols: AM0080 Estimated annual GHG reductions: 83042 tCO2e Region: Asia Registration date: 2023-03-09

Red Flags

  • Claimed emission reductions were far above verified emissions reductions, with 794,043 claimed versus 110,002 verified.
  • The issuance document lists many material findings and corrective actions, including missing baseline, monitoring, and stakeholder-consultation details.
  • A contradiction exists on leakage treatment: one document says leakage was not addressed, while the later issuance record says it was deemed negligible.

Credit Vintages Exhausted

Issued Retired Available
2020
14,620 14,620 0
2021
62,264 62,264 0
2022
33,118 33,118 0
Total 110,002 110,002 0

Cosa migliorerebbe questo punteggio

  • Publish a complete, reconciled monitoring and issuance package with all calculation spreadsheets, parameter values, and a clear explanation for the claimed-versus-verified reduction gap.
  • Resolve the outstanding baseline, leakage, and stakeholder-consultation issues with a fully documented, VVB-traceable update and explicit evidence for each corrective action closure.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed test

Permanence

reversal risk not addressed

Leakage

0% deduction with contradiction

Baseline

project baseline, reassessment timing limited

Safeguards

partial safeguards documented

Double-claim

CORSIA-eligible, CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti