CSD Wastewater Treatment Plant Project in Hebei Province
#7of 28 in Water#91of 204 in China#306of 629 in Verra (VCS)
Audit Analysis
A registered VCS wastewater treatment project in Hebei Province with VVB-confirmed additionality and consistent ERR reporting, but significant gaps in permanence safeguards (no buffer pool stated, reversal events unaddressed), absent community safeguards (no FPIC, no grievance mechanism per the final verification report), and a project-specific baseline that limits robustness. The high volume of closed corrective actions (32 CARs) indicates substantial initial documentation weaknesses that were remediated before verification.
Red Flags
- No buffer pool percentage stated and reversal events explicitly 'not addressed' in the verification report, leaving permanence risk unquantified for a 10-year crediting period
- The final verification report (2023-03-10) records no grievance mechanism, no benefit-sharing description, and no safeguards documentation, while an earlier version of the same report (2023-03-06) indicated these were present — a concerning internal inconsistency
- 32 Corrective Action Requests and 10 Clarification Requests were raised during verification, indicating the initial project documentation had substantial gaps that required remediation before the VVB could sign off
- FPIC was not conducted and the project-specific baseline has no recorded reassessment date, limiting confidence in long-term baseline validity
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 69,913 | 69,913 | 0 | |
| 2022 | 91,620 | 58,639 | 32,981 | |
| Total | 161,533 | 128,552 | 32,981 |
Risk Indicators
VVB-confirmed combined test
No buffer pool stated; reversal unaddressed
0% deemed negligible, reasonable for WWTP
Project-specific; no reassessment date
No FPIC, no grievance, no safeguards (final VR)
Not CORSIA-eligible; CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →