Bishuiyuan Wastewater Treatment Plant Project

VCS-4338 ↗

#4of 28 in Water#56of 204 in China#175of 629 in Verra (VCS)

5.9/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.5
Documentation
5.5

Audit Analysis

The Bishuiyuan Wastewater Treatment Plant project demonstrates solid additionality (combined test confirmed by the VVB) and conservative emissions reductions delivery (~32% of pro-rata expectation), but is weakened by an unaddressed leakage assessment, a project-specific baseline with inconsistent documentation, and multiple cross-document contradictions that reduce overall data reliability.

Red Flags

  • Leakage deduction of 0% with justification recorded as 'not addressed' in the verification report — no quantitative or qualitative leakage analysis found for a wastewater discharge project
  • Six contradictions across documents, including FPIC status (conducted vs. not conducted), baseline characterisation (measured vs. mixed), and additionality test type (combined vs. investment), indicating inconsistent record-keeping
  • No buffer pool percentage stated in any available document, leaving permanence risk unquantified
  • CORSIA eligibility and CCP status both not stated in any document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2022
10,000010,000
Total10,000010,000

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

No buffer pool stated; avoidance project

Leakage

0% deduction, not addressed in VR

Baseline

Project-specific, measured; PDD discrepancy

Safeguards

FPIC contradicted; grievance present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AM0080

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents