Grouped Water Purification Project in India
#19of 28 in Water#323of 387 in India#516of 629 in Verra (VCS)#12of 23 in AMS-II.I
Audit Analysis
The project has a VVB-verified investment additionality test and no material findings, but is undermined by a factor-of-100 discrepancy in the reference energy factor between the PDD and verification report, and a verified emission reduction that is only about 4% of the pro-rata expectation for the elapsed monitoring period. These issues raise serious questions about the robustness of the baseline and the magnitude of the claimed credits.
Red Flags
- FNRB value differs by a factor of 100 between the verification report (80.82) and the PDD (0.8082), creating a potential 100× over-crediting risk if the lower value is correct
- Verified ERR of 1,537 tCO2e is only ~4% of the pro-rata expectation (~39,300 tCO2e) for the 1.66-year monitoring period out of the 10-year crediting period, suggesting the baseline may be significantly overstated
- Leakage justification is inconsistent: the PDD (2024-07) states leakage was 'quantified' while the verification report (2024-09) states it was 'not addressed'
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 31 | 0 | 31 | |
| 2022 | 645 | 0 | 645 | |
| 2023 | 861 | 0 | 861 | |
| Total | 1,537 | 0 | 1,537 |
Risk Indicators
VVB-confirmed investment test
No buffer pool stated; reversals unconfirmed
5% deduction applied but justification inconsistent
Project-specific; FNRB contradicted by 100×
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →