Water Purification System for Safe Drinking Water (SDW) in Cambodia
#28of 108 in Water#5of 18 in Cambodia#430of 1339 in Verra (VCS)#9of 72 in AMS-II.I
Audit Analysis
A VCS-registered water purification project in Cambodia with VVB-verified additionality and a quantified 5% leakage deduction, but undermined by nine cross-document contradictions—most critically a 40× gap between the PDD's lifetime ERR estimate (35,741 tCO₂e) and the verified 18-month figure (884 tCO₂e), which represents only ~16% of the pro-rata expectation. The verification report flags a non-permanence risk analysis while no buffer pool percentage is stated, and the PDD appears to describe an earlier iteration of the project (different crediting period, different leakage and usage assumptions).
Red Flags
- Verified ERR of 884 tCO₂e over 18 months is only ~16% of the pro-rata expectation derived from the PDD's 35,741 tCO₂e lifetime estimate, raising questions about PDD validity or project under-performance
- Verification report reports a non-permanence risk analysis (reversal events 'reported') while no buffer pool percentage is stated in any document
- Nine contradictions across documents, including the PDD crediting period (2022-07-01 to 2032-06-30) differing from the verification report's period (2023-04-01 to 2033-03-31), suggesting the PDD may describe a prior project iteration
- CORSIA eligibility and CCP status are not stated in any available document
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified combined test
Non-permanence risk flagged
5% quantified deduction applied
Project-specific; reassessment date not stated
FPIC, grievance mechanism, and safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →