Grouped Projects For Laos Water Purifier
#371of 629 in Verra (VCS)#6of 23 in AMS-II.I
Audit Analysis
The Laos water purifier grouped project has a confirmed additionality test and quantified leakage deduction, but the verified emissions reduction of 134,200 tCO2e in a single 6-month monitoring period equals the entire 10-year lifetime estimate, representing a 20× over-delivery relative to pro-rata expectation. Ten contradictions across documents—including conflicting ERR figures, additionality test types, and fNRB methods—undermine confidence in the data. The project is not CORSIA-eligible and no reversal events were reported, but the over-crediting risk and project-specific baseline warrant caution.
Red Flags
- Verified ERR of 134,200 tCO2e for the 6-month monitoring period (Jan–Jun 2025) equals the full 10-year lifetime estimate, implying a 20× over-delivery relative to the pro-rata expectation of ~6,710 tCO2e
- Ten contradictions across documents, including conflicting ERR figures (134,200 vs 84,968), additionality test type (investment vs barrier), fNRB method (not applicable vs national default), and crediting period start dates
- Buffer pool percentage not stated in any available document, leaving permanence risk unquantified
- Baseline is project-specific rather than jurisdictional, and no baseline reassessment date is recorded
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 23,867 | 0 | 23,867 | |
| 2024 | 150,896 | 0 | 150,896 | |
| 2025 | 100,000 | 0 | 100,000 | |
| Total | 274,763 | 0 | 274,763 |
Risk Indicators
VVB-confirmed investment test
No reversals but buffer pool not stated
5% quantified deduction
Project-specific, no reassessment date
FPIC and grievance confirmed but contradictory across docs
CORSIA excluded, CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →