Skip to main content
CDMMethane avoidanceThailandAMS-III.H

Avoidance of methane emission from the wastewater treatment facility in K.S. Bio-Plus Co., Ltd., Thailand

CDM-7788 ↗

#43of 108 in Water#18of 48 in Thailand#649of 1459 in CDM (UNFCCC)#13of 55 in AMS-III.H

5.2/ 10
Integrity
4.8
Transparency
5.5
Claim Safety
5.8
Documentation
4.5

Audit Analysis

A CDM methane-avoidance project at a Thai wastewater treatment facility with VVB-confirmed additionality (investment test) and a measured project-specific baseline. The project delivered only about 68% of its pro-rata ex-ante expectation over the monitoring period, suggesting a conservative baseline, but the 22 material findings and corrective actions identified during validation reveal significant initial PDD deficiencies. Leakage was set at 0% with a minimal 'deemed negligible' justification, and several key transparency fields remain unreported.

Red Flags

  • 22 material findings and 22 corrective actions identified during validation, including missing project emissions from grid electricity, incorrect wastewater flow-rate calculation (270 vs 240 operating days), and an unaccounted fourth generator unit — indicating a substantially deficient initial PDD
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, which is thin for a methane-avoidance project where fugitive emissions from the treatment system are plausible
  • Cumulative verified ERR of 325,068 tCO₂e over the 7.75-year monitoring period is only ~68% of the pro-rata expectation (~476,000) derived from the PDD's 614,180 tCO₂e ex-ante estimate for the full 10-year crediting period, raising questions about baseline accuracy
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2014
25,580025,580
Total25,580025,580

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversals reported

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, measured; 68% pro-rata delivery

Safeguards

Safeguards mentioned, FPIC and grievance not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-III.H, AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents