Grid emission factor: the methodology sets rules for it in some cases (ACM0010 v09.0 §5.2.2, p. 10). CarbonMeld reads it in the project's documents. CM-F-ACM0010-GRID-EF
ACM0010 — GHG emission reductions from manure management systems
About this methodology
Projects change how livestock manure is treated, on farms or at a central facility. The method measures greenhouse gas reductions compared with the manure treatment that would otherwise occur.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 9.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Livestock and waste
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (62 projects)
- Gold Standard (GS) (27 projects)
- Global Carbon Council (GCC) (3 projects)
2 more
- BioCarbon Registry (BCR) (1 project)
- International Carbon Registry (ICR) (1 project)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
A methane activity the law requires A-LEGAL
The rule applies to projects that capture or avoid methane. These are landfill gas, manure, wastewater, composting and coal-mine methane. They also include orphan wells, oil and gas leaks, rice, enteric methane and household biogas. The documents state that the law requires the activity. Or the documents state that a law requires the capture of the gas. An activity that the law already requires is not additional. If the documents show that the baseline already deducts the amount that the law requires, CarbonMeld takes no point.
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it (ACM0010 v09.0 §5.5, p. 21). Our current method does not assess it. CM-F-ACM0010-LEAKAGE
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-ACM0010-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
All 10 versions
-
v09.0adopted 8 Nov 2025source
Address fugitive methane emissions from biogas digesters and incorporate updated methods by the IPCC.
-
v08.0adopted 4 Oct 2013source
Removes requirements for specific case CPA-DDs and frequency of updating of eligibility criteria as these requirements are specified in the relevant standards; Changes the title from “ACM0010: Consolidated baseline methodology for GHG …
-
v07.0.0adopted 13 Sept 2012source
Expands the applicability of the methodology to include Greenfield facilities; Simplifies the procedures to estimate baseline emissions associated with heat generation.
-
v06.0.0adopted 20 Jul 2012source
Adds a reference to methodological tools; Improves the clarity of the language and provides an additional option to estimate project N2O emissions; Introduces provisions for the use of this methodology in a project activity under a PoA.
-
v05adopted 26 Sept 2008source
Addition of sampling procedures to estimate the animal weight; Equation 1 in annex 2 was amended to keep unit consistency with equation 1a.
-
v04.1adopted 16 May 2008source
“Tool to calculate baseline, project and/or leakage emissions from electricity consumption” replaces the withdrawn “Tool to calculate project emissions from electricity consumption”.
-
v04adopted 16 May 2008source
Inclusion of new formula to determine the annual average number of animals ( LT N ); Reformat of the graphic in the monitoring section showing the points where the gas has to be measured.
-
v03adopted 19 Oct 2007source
Incorporation to the methodology of the following tools: Tool to calculate project or leakage CO2 emissions from fossil fuel combustion; Tool to calculate project emissions from electricity consumption. Addition of the formula to determine …
-
v02adopted 15 Dec 2006source
Inclusion of the “Tool to determine project emissions from flaring gases containing methane”; Replace of emissions Project emissions from flaring of the residual gas stream.
-
v01adopted 29 Sept 2006source
Initial adoption.
Top projects using ACM0010
This page ranks projects using ACM0010 by their CarbonMeld document-based ratings. The rank compares project ratings; it is not a rating of the methodology itself.
30 rated projects of the 120 tracked in this methodology · average rating 4.8/10 · ranked by CarbonMeld's document-based rating: additionality, quantification, permanence (where carbon is stored) and claim safety.
67 analysed project pages, A–Z →
Which registries list projects under ACM0010?
In CarbonMeld's data, ACM0010 projects are on 6 registries: Verra (62), Gold Standard (27) and CDM (26), and 3 more. Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Verra (VCS) | 62 | 38 | See the list |
| Gold Standard (GS) | 27 | 25 | See the list |
| CDM (UNFCCC) | 26 | 9 | See the list |
| Global Carbon Council (GCC) | 3 | 0 | See the list |
| BioCarbon Registry (BCR) | 1 | 0 | See the list |
| International Carbon Registry (ICR) | 1 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis, so they can be larger than the ranking below. «Registered» counts the records whose current registry status is «registered», as last read (24 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- 4 4.9
- 5 4.9
- 6 4.8
- 7 4.8
- 8 4.8
- 9 4.8
- 10 4.8
- 11 4.8
- 12 4.8
- 13 4.8
- 14 4.8
- 15 4.8
- 16 4.8
- 17 4.8
- 18 4.8
- 19 4.7
- 20 4.6
- 21 4.6
- 22 4.6
- 23 4.6
- 24 4.6
- 25 4.6
- 26 4.6
- 27 4.6
- 28 4.6
- 29 4.6
- 30 4.6