Wenshi AMMS GHG Mitigation Project in Jiangsu Province
GS-3977 ↗ · current registry ID: GS12076
#105of 268 in Biogas#656of 1084 in China#904of 1801 in Gold Standard (GS)#38of 66 in ACM0010
Audit Analysis
The Wenshi AMMS biogas project in Jiangsu has VVB-confirmed additionality and a verified ERR of 235,918 tCO₂e for the first monitoring period, delivering roughly 90% of the pro-rata lifetime expectation. However, the project relies on a project-specific modeled baseline, lacks a stated buffer pool, and the verification report identified 11 corrective actions alongside over 25 PDD-level findings including baseline calculation errors, indicating meaningful design and documentation weaknesses.
Red Flags
- 11 corrective actions (CARs) raised in the verification report covering calculation errors, missing QA/QC procedures, and incorrect emission factor values
- Over 25 PDD-level findings including incorrect baseline estimates, outdated IPCC versions, and missing financial indicators for the additionality test
- No buffer pool percentage stated in any available document for a biogas project with inherent system-failure reversal risk
- Leakage treatment contradicts between the PDD (not addressed) and the verification report (quantified), with no specific deduction percentage extracted
- Baseline is project-specific and modeled with no reassessment date recorded
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
biogas reversal risk
Quantified per VVB but PDD contradicts; no % extracted
Project-specific, modeled; no reassessment date
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →