Shilichong AMWS GHG Mitigation Project
GS-3949 ↗ · current registry ID: GS12075
#102of 268 in Biogas#652of 1084 in China#878of 1801 in Gold Standard (GS)#36of 66 in ACM0010
Audit Analysis
The Shilichong AMWS biogas project in China is a Gold Standard project with a VVB-confirmed combined additionality test and no reported reversal events, but it carries moderate risks from a project-specific modeled baseline, a leakage treatment contradiction between the PDD and verification report, and four corrective actions required in the monitoring report. The 2024 verified ERR of 174,033 tCO₂e represents roughly 106% of the pro-rata lifetime expectation, indicating the project is delivering close to its ex-ante estimate.
Red Flags
- Leakage treatment is contradictory: the PDD (2024-11-21) states leakage was 'deemed negligible' while the verification report (2024-11-25) states it was 'quantified'; the actual deduction percentage is not stated in either document
- Four corrective actions were required in the monitoring report (missing milestone table, missing FAR response, missing MCFj data source, missing sampling method description), indicating documentation gaps in the MR
- Baseline is project-specific and modeled, with no record of a baseline reassessment date; the grid emission factor of 0.57335 tCO₂/MWh (2023) is the only quantified baseline parameter available
- FNRB value, usage monitoring method, and buffer pool percentage are all absent from the extracted record, leaving key MRV parameters unverified
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Biogas project, no reversal events
Contradictory treatment, deduction not stated
Project-specific, modeled, no reassessment date
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →