ALTACA MERAM BIOGAS PLANT

GS-1035 ↗

4.3 / 10
Integrity
4.8
Transparency
4.0
Claim Safety
4.5
Documentation
3.0

Score Breakdown

Integrity

verified Additionality confirmed by the VVB in the verification report (verification report, 2025-06-18).

missing Reversal treatment not addressed in the latest verification report and buffer pool percentage not stated, increasing permanence risk.

Transparency

verified VVB named (Earthood Services Limited) and monitoring period provided (2022-07-01 — 2024-06-30).

missing Key MRV values missing from extracted records (total emission reductions claimed/verified, leakage deduction percentage, FNRB), and evidence docs are listed as unknown; extraction confidence marked low.

Claim Safety

verified Project uses a stated Gold Standard consolidated methodology and reports a grid emission factor (0.5552), providing a clear baseline approach.

missing Leakage justification and leakage deduction percentage are not addressed in the latest document; this raises over-crediting risk where leakage could be material.

Documentation

verified A recent verification report exists (doc date 2025-06-18) and 14 documents were used in extraction.

missing Min extraction confidence is low, evidence documents are labelled unknown, and many fields (buffer pool, FNRB, total ERR verified) are missing from the extracted record.

Detailed Analysis

Integrity

The verification report (2025-06-18) confirms additionality using a combined test and the VVB signed off on additionality, which supports integrity. The project uses a project-specific baseline under the Gold Standard methodology and reports a grid emission factor of 0.5552. However, permanence is weakened because the latest verification does not address reversal events and no buffer pool percentage is stated in the extracted record. A large number of corrective action requests (65 CARs, 16 clarifications) were raised and closed per the verification report, which shows issues were found and addressed but also indicates earlier shortcomings in documentation and controls.

Transparency

Transparency is mixed: the VVB is named and monitoring period is provided, but core MRV numbers (total emission reductions claimed/verified, leakage deduction percentage, FNRB) are not found in the extracted record. Evidence documents are listed as unknown despite 14 documents being used, and the minimum extraction confidence is low, which reduces confidence in the completeness of the public record.

Claim Safety

There is some safety from use of an established Gold Standard methodology and a stated grid emission factor, reducing ambiguity about baseline calculation. Nonetheless, missing leakage treatment (no leakage deduction percentage, and leakage justification shown as not addressed in the latest document) increases the chance of over-crediting. CORSIA/CCP status is not stated, leaving double-claim risk uncertain.

Documentation

A recent verification report exists (2025-06-18) and corrective actions were closed, which is positive. However, many important fields are not present in the extracted record (buffer pool percentage, FNRB, claimed vs verified ERR), evidence docs are unspecified, and the extractor flagged low confidence. These factors justify a conservative documentation score.

Overall

I privileged values in the most recent verification report (2025-06-18) where contradictions existed because it is the latest VVB-signed document and would typically supersede older documents, but I note low extraction confidence. Specifically: (1) reversal events — older record (2024-11-12) reported none, but the 2025 verification indicates reversal treatment is not addressed; I privileged the 2025 verification but lowered scores because that indicates a gap. (2) leakage justification — an older 2020 document deemed leakage negligible, but the 2025 verification shows leakage justification not addressed; I privileged the 2025 verification as more recent and relevant, again reducing scores. (3) crediting period — conflicting dates exist; I privileged the 2025 verification date showing 2022-07-01 — 2027-06-30 as current. The low extraction confidence and unresolved MRV fields reduced transparency and documentation scores and therefore pulled down the overall score to a moderate–low rating (4.3).

Audit Analysis

Project shows some procedural strengths (additionality confirmed by the VVB and a recent verification report) but important gaps remain: leakage and reversal treatment are not clearly addressed in the latest documentation, many quantitative MRV fields are missing, and extraction confidence is low. Overall quality is moderate–low and would benefit from clearer leakage, reversal and registry disclosures.

Project Description

Developer: GTE KARBON SUSTAINABLE ENERJI EGITIM DANISMANLIK VE TICARET A.S. Type: Biogas - Electricity Size: Large Scale Crediting period: 2022-07-01 → 2027-06-30 Estimated annual credits: 110277 tCO2e SDGs: Goal 12: Responsible Production and Consumption, Goal 7: Affordable and Clean Energy, Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth

Red Flags

  • Latest verification record does not address reversals (reversal treatment unclear).
  • Leakage justification not addressed in the most recent document; older documents claim negligible leakage.

Credit Vintages

Issued Retired Available
2022
45,751 0 45,751
2023
68,932 0 68,932
2024
29,666 0 29,666
Total 144,349 0 144,349

Cosa migliorerebbe questo punteggio

  • Publish clear leakage assessment and any leakage deduction percentage or justification in the monitoring/verification report.
  • Provide complete MRV figures publicly (total emission reductions claimed and verified, buffer pool percentage, FNRB) and attach evidence documents with higher extraction/readability confidence.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed

Permanence

reversal unclear

Leakage

not addressed

Baseline

project-specific baseline

Safeguards

FPIC & grievance present

Double-claim

CORSIA/CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-24 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti