Skip to main content
GSBiogas - ElectricityChinaACM0010

Shuangbaotai Animal Manure Management System GHG Mitigation Project in Anhui Province

GS-3359 ↗ · current registry ID: GS11338

#119of 268 in Biogas#698of 1084 in China#981of 1801 in Gold Standard (GS)#41of 66 in ACM0010

4.9/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.5
Documentation
5.0

Audit Analysis

A Gold Standard biogas-to-electricity project in Anhui, China, with VVB-confirmed additionality and no material findings, but significant gaps in verified emissions data, contradictory leakage treatment across documents, and no buffer pool. The project is CORSIA-eligible with CCP status unstated, creating dual-channel risk. Documentation is reasonably extensive (16 documents) but contains four inter-document contradictions that undermine confidence in the record.

Red Flags

  • Total verified ERR is not found in any available document, making it impossible to confirm actual delivery against the 968,365 tCO2e claimed
  • Leakage treatment is contradictory: the verification report (2023) states it is 'quantified' while the monitoring report (2020) states it is 'not addressed', and no specific deduction percentage is recorded
  • CORSIA eligibility is confirmed but CCP status is not stated, leaving dual-channel double-counting risk unresolved

Credit Vintages

IssuedRetiredAvailable
2020
2,1392,1390
2021
149,037149,0370
2022
73,80418,35055,454
Total224,980169,52655,454

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

no reversal events reported

Leakage

Contradictory treatment; no % stated

Baseline

Project-specific, modeled; no reassessment date

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA-eligible; CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06ACM0010

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents