Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Livestock, enteric fermentation, and manure management; Waste handling and disposalChina Registry: RegisteredACM0010

Jiangxi Xinsheng Swine Farm Manure Management System GHG Mitigation Project

VCS-4496 ↗

#148of 261 in Soil carbon#891of 1084 in China#1004of 1339 in Verra (VCS)#53of 66 in ACM0010

4.5/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A registered VCS biogas project (ACM0010) on a Chinese swine farm with VVB-confirmed additionality, but the validation report surfaced 14 material findings including a weakly justified zero-leakage claim, a questionable 2006 financial benchmark applied to a 2021 project, and inconsistent parameter values. All corrective actions were closed and no forwarded action was raised, yet the cumulative documentation weaknesses and the absence of any monitoring-period data limit confidence in the 215,250-tonne lifetime claim.

Red Flags

  • Zero leakage deduction is explicitly flagged in the validation report as lacking justification for anaerobic digester emissions, yet no quantified deduction was applied.
  • The financial benchmark used for the additionality investment test derives from a 2006 document applied to a 2021 project, and the static investment calculation for baseline anaerobic lagoons was missing at validation.
  • The MCFj parameter is inconsistent between the PDD and validation report (76% vs 71%), raising questions about the accuracy of the methane conversion factor used in the ERR calculation.
  • Low extraction confidence across the document set means key parameters (buffer pool, monitoring period, usage rates, FPIC) could not be confirmed from available records.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed but financial benchmark and IRR gaps flagged

Permanence

Biogas avoidance (low reversal risk) but buffer pool not stated

Leakage

0% deduction with acknowledged lack of justification

Baseline

Project-specific modeled baseline; scenario exclusion questioned

Safeguards

Grievance mechanism present; FPIC not confirmed

Double-claim

CORSIA and CCP status not stated in available records

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0010

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents