Tieqilishi AWMS GHG Mitigation Project in Sichuan Province
GS-3644 ↗ · current registry ID: GS11712
#71of 268 in Biogas#533of 1084 in China#645of 1801 in Gold Standard (GS)#26of 66 in ACM0010
Audit Analysis
A Gold Standard biogas-to-electricity project in Sichuan with VVB-verified additionality and no reversal events, but undermined by a contradiction on whether biogas capture is legally required, a project-specific modeled baseline, and 14 corrective action requests indicating data-quality weaknesses. The project delivered roughly 82% of its pro-rata ex-ante expectation for the 2024 monitoring period, which is reasonable but leaves several key MRV parameters (FNRB, usage rates, buffer pool) unquantified in the available record.
Red Flags
- Contradiction on legal requirement for biogas capture: the verification report (2023) states capture is legally required, while the PDD (2020) states it is not — if legally mandated, the additionality claim is materially weakened
- 14 Corrective Action Requests and 5 Clarification Requests raised by the VVB, including incorrect ex-ante temperature values and inaccurate process-flow diagrams, indicating systematic data-quality issues
- Leakage is described as 'quantified' in the justification but the actual deduction percentage is not stated in any extracted document
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified but legal-requirement contradiction
mixed evidence / unresolved risk
Quantified but deduction percentage not stated
Project-specific, modeled, reassessment timing not stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →