Dongrui Animal Manure Management System GHG Mitigation Project in Heyuan City
GS-3636 ↗ · current registry ID: GS11674
#28of 111 in Biogas#93of 204 in China#168of 426 in Gold Standard (GS)#7of 17 in ACM0010
Audit Analysis
A Gold Standard biogas-to-electricity project in Heyuan, China, with VVB-confirmed additionality and quantified leakage, but undermined by multiple material findings, a design-change FAR, absence of a stated buffer pool, and contradictory ERR figures across documents. The project delivered roughly four times the pro-rata ex-ante expectation for the elapsed monitoring period, raising questions about baseline conservatism or scope expansion. Overall a moderate-quality credit with notable data-reliability concerns.
Red Flags
- No buffer pool percentage stated in any available document, leaving permanence risk unquantified for a biogas project with inherent reversal exposure
- Verification report (2023-03-14) records reversal events as 'not addressed' while the monitoring report (2024-03-22) states none occurred — permanence was not explicitly evaluated in the verification
- A FAR was issued for a design change (new breeding swine introduction, Nov 2023), indicating the project scope shifted after validation
- ERR figures conflict across documents: 346,835 (verification report) vs 701,790 (unidentified document) vs 423,531 (validation report), with the 'unknown' source reducing data reliability
- Leakage treatment is inconsistent: the validation report deems it negligible while the verification report describes it as quantified
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 59,406 | 59,406 | 0 | |
| 2022 | 354,508 | 327,629 | 26,879 | |
| 2023 | 287,850 | 0 | 287,850 | |
| Total | 701,764 | 387,035 | 314,729 |
Risk Indicators
VVB-confirmed combined test
No buffer pool stated; reversal not explicitly evaluated
Quantified per verification report
Project-specific, modeled, no reassessment recorded
FPIC, grievance mechanism, benefit sharing documented
CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →