Wenshi AMMS GHG Mitigation Project in Anhui Province
GS-3976 ↗ · current registry ID: GS12077
#73of 268 in Biogas#536of 1084 in China#663of 1801 in Gold Standard (GS)#27of 66 in ACM0010
Audit Analysis
The Wenshi AMMS biogas project in Anhui Province has a VVB-confirmed additionality assessment and no material findings, but is held back by a project-specific modeled baseline, a leakage treatment contradiction between the PDD and verification report, and eleven corrective actions flagging monitoring and QA/QC gaps. The verified ERR for the first monitoring period is roughly 88% of the pro-rata lifetime expectation, indicating no over-crediting but also no surplus delivery.
Red Flags
- Eleven corrective actions in the verification report cover monitoring methodology, QA/QC procedures, data consistency (Np,LT values), calibration, and social indicators — indicating a monitoring process with multiple unresolved weaknesses.
- Leakage treatment is contradictory: the PDD states leakage was 'not addressed' while the verification report records it as 'quantified'; the specific deduction percentage is not stated in any document.
- Baseline is project-specific and modeled, with no reassessment date recorded; the grid emission factor (0.48665 tCO₂/MWh, 2023) is a single-year value with no stated update mechanism.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
Contradictory treatment; no deduction % stated
Project-specific modeled; no reassessment date
FPIC, grievance mechanism, benefits sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →