Jintai Animal Manure Management System GHG Mitigation Project
GS-3968 ↗ · current registry ID: GS12048
#159of 268 in Biogas#850of 1084 in China#1252of 1801 in Gold Standard (GS)#50of 66 in ACM0010
Audit Analysis
The Jintai biogas project in China has a VVB-verified additionality assessment and no reported reversal events, but is undermined by a project-specific modeled baseline, a 0% leakage deduction with thin justification, and 12 corrective actions flagging calculation inconsistencies and documentation gaps. A significant discrepancy between the monitoring report (10,171 tCO₂e) and the verification report (29,849 tCO₂e) for the same period raises data-reliability concerns that temper confidence in the claimed reductions.
Red Flags
- ERR discrepancy: monitoring report states 10,171 tCO₂e while the verification report states 29,849 tCO₂e for the same monitoring period — a ~3× gap that undermines data reliability
- 12 corrective actions required, including inconsistencies between baseline/project emission values in the MR and MR sheet, outdated Tool 6 version, and unit errors in the ER calculation
- FNRB (fraction of non-recovered biogas) value not stated in any document, a critical parameter for ACM0010 biogas projects
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 6,154 | 0 | 6,154 | |
| 2023 | 4,017 | 0 | 4,017 | |
| Total | 10,171 | 0 | 10,171 |
Risk Indicators
VVB-confirmed combined test
no reversals
0% deduction, quantified but unquantified
Project-specific, modeled, no reassessment date
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →