Vai al contenuto principale
GS Biogas - Electricity China Documentazione completa General Methodology v2.0

Shuangbaotai Animal Manure Management System GHG Mitigation Project in Guangxi Province

GS-3357 ↗

4.6 / 10
Integrity
5.1
Transparency
4.2
Claim Safety
4.6
Documentation
3.8

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project uses a combined additionality test under the Gold Standard TPDDTEC methodology.

missing Reversal treatment is not clearly addressed, buffer pool coverage is not stated, and the record shows multiple verification findings with corrective actions required.

Transparency

verified The monitoring period is stated, the VVB is named, and the project is linked to Gold Standard registry documentation.

missing Total emissions reductions claimed versus verified are not stated, and several monitoring details such as usage monitoring and FNRB inputs are missing.

Claim Safety

verified Leakage is described as quantified, which is better than an unaddressed leakage assumption.

missing The project is marked CORSIA-eligible, but CCP status is not stated and the record contains contradictions on core period data, increasing over-crediting and claim-risk concerns.

Documentation

verified Multiple evidence documents were used, including a PDD and monitoring report, and safeguards are explicitly mentioned.

missing Extraction confidence is low, the document set includes an unknown source, and several key fields are not stated in available documents.

Detailed Analysis

Integrity

The project benefits from a VVB-confirmed additionality assessment and a combined additionality test, which supports the baseline and project rationale. Still, reversal handling is weakly documented: reversal events are marked as not addressed, buffer pool coverage is not stated, and the record includes several verification findings with corrective actions required. Leakage is at least acknowledged as quantified, but the absence of a stated deduction percentage limits confidence in the robustness of the crediting approach.

Transparency

The monitoring period and VVB identity are available, and the project is tied to Gold Standard documentation, which helps traceability. However, total emissions reductions claimed and verified are not stated, and important MRV details such as usage monitoring and FNRB inputs are missing from the extracted record. The low extraction confidence further reduces transparency because at least one key document was poorly readable.

Claim Safety

Claim safety is weakened by missing quantitative evidence on usage rates, FNRB, and verified emissions reductions, all of which are important for biogas electricity projects. The project is marked CORSIA-eligible, while CCP status is not stated, so dual-claim risk cannot be ruled out from the available record. Leakage being quantified is a positive, but the contradictory period information and unresolved reversal treatment increase the risk of over-crediting.

Documentation

The evidence base includes multiple official documents, including a PDD and monitoring report, and the project documents safeguards such as FPIC, grievance mechanisms, and benefit sharing. Even so, the extraction confidence is low, one document source is unknown, and several fields are not stated in available documents. The presence of three corrective action requests also suggests the documentation package was not fully clean at verification.

Overall

Overall confidence is moderate to low because the project has some strong procedural elements but also important reliability issues. I privileged the more recent monitoring-report information where it appeared to be the later source, but the contradiction on the crediting period remains unresolved because both dates come from monitoring reports and the record does not explain the discrepancy. I also treated the reversal-event inconsistency conservatively: one source says not addressed, while another later record suggests none reported, so the safer interpretation is that reversal treatment is not clearly documented.

Audit Analysis

The project has some positive signs, including VVB-confirmed additionality, FPIC, grievance mechanisms, and quantified leakage treatment. However, key documentation gaps, low extraction confidence, unresolved corrective actions, and contradictions in the crediting period and reversal treatment reduce confidence in the claimed climate benefits.

Project Description

Developer: Profit Carbon Environmental Energy Technology (Shanghai) Co., Ltd. Type: Biogas - Electricity Size: Large Scale Methodology: ACM0010 GHG emission reductions from manure management systems Crediting period: 2021-01-20 → 2026-01-19 Estimated annual credits: 280549 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth, Goal 13: Climate Action

Red Flags

  • Six verification issues were raised, including three corrective action requests, and the extraction confidence is low.
  • The documents conflict on the crediting period and on whether reversal events were addressed, which weakens reliability.

Credit Vintages

Issued Retired Available
2021
206,817 259 206,558
2022
53,875 24,936 28,939
Total 260,692 25,195 235,497

Cosa migliorerebbe questo punteggio

  • Publish the verified emissions reduction totals, leakage deduction percentage, and usage monitoring methodology for the monitoring period.
  • Resolve the crediting-period and reversal-event contradictions in a reconciled verification note, and disclose buffer pool treatment and any outstanding corrective action closures.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed test

Permanence

reversal treatment unclear

Leakage

quantified but not fully specified

Baseline

project baseline, reassessment missing

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA-eligible, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-18 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti