Swine Farm Animal Manure Management System GHG Mitigation Project in Hubei Province
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses a combined additionality test under ACM0010.
missing Leakage treatment is not stated, and buffer pool coverage is not found in the extracted record.
Transparency
verified The monitoring report identifies the VVB, the monitoring period, and the methodology version used.
missing Total claimed versus verified emission reductions are not stated, and usage monitoring details are missing.
Claim Safety
verified The project is listed as CORSIA-eligible, which suggests some external eligibility screening was met.
missing The baseline is project-specific rather than a standardized reassessed baseline, and leakage treatment is not documented.
Documentation
verified Fourteen documents were used, and the monitoring report records 18 CARs and 14 CLs that were successfully closed.
missing Extraction confidence is only medium, and the record contains a crediting-period contradiction across documents.
Detailed Analysis
Integrity
The project has a positive integrity signal because the VVB confirmed additionality and the monitoring report shows no extreme event that would indicate a reversal. However, the baseline is project-specific, the last reassessment is not found, and leakage is not quantified or justified in the extracted record. No buffer pool percentage is stated, so permanence and leakage controls are only partially evidenced.
Transparency
Transparency is mixed: the monitoring report names Shenzhen CTI International Certification Co., Ltd. as the VVB and gives a clear monitoring period from 2023-01-01 to 2023-12-31. But the record does not state total claimed versus verified reductions, usage monitoring method, or any grid-factor inputs, which limits auditability. The medium extraction confidence also means at least one source was not fully clear.
Claim Safety
Claim safety is moderate because the project is biogas electricity under ACM0010 and the VVB-confirmed additionality reduces some over-crediting concern. Still, the absence of leakage treatment, missing usage-rate evidence, and a project-specific baseline leave room for uncertainty about the robustness of the claimed reductions. CORSIA eligibility is stated, but CCP status is not found, so dual-market claim risk is not fully resolved.
Documentation
Documentation quality is fair but incomplete. The record includes 14 documents, the monitoring report date, and a list of 18 CARs and 14 CLs that were closed, which supports some review depth. However, key fields are missing, extraction confidence is only medium, and the crediting period is inconsistent across documents, reducing confidence in the completeness of the file.
Overall
Overall, this is a mid-quality project file with some strong points, especially VVB-confirmed additionality and no reported reversal event in the available monitoring evidence. I privileged the monitoring report’s reversal statement over the contradictory later note because it is the direct project evidence, but I downgraded reliability because the reversal field is also marked not addressed in the extracted record. I also privileged the monitoring report’s crediting period as the explicit source document, while noting the later conflicting period from another document; that contradiction, plus missing leakage and MRV details, keeps the score in the middle range.
Audit Analysis
This is a biogas electricity project with VVB-confirmed additionality and no reported reversal event in the available monitoring evidence, but several key MRV fields are missing or not stated. The record also contains a crediting-period contradiction and no quantified leakage treatment, which weakens confidence in the claimed emission reductions.
Project Description
Developer: Profit Carbon Environmental Energy Technology (Shanghai) Co., Ltd. Type: Biogas - Electricity Size: Large Scale Methodology: ACM0010 GHG emission reductions from manure management systems Crediting period: 2021-01-01 → 2025-12-31 Estimated annual credits: 292339 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth, Goal 13: Climate Action
Red Flags
- No leakage deduction or leakage justification is stated in the available documents.
- The crediting period differs across documents, creating a reliability issue for the project timeline.
Credit Vintages
Nessuna emissione registrata sul registro.
Cosa migliorerebbe questo punteggio
- Provide a quantified leakage assessment and any deduction rationale, or a clear justification for why leakage is negligible.
- Publish a reconciled monitoring package that resolves the crediting-period contradiction and states claimed versus verified emission reductions.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed combined test
No reversal reported, but permanence controls not fully evid
No leakage treatment stated
Project baseline, reassessment not found
FPIC, grievance mechanism, and safeguards noted
CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- T-PerfCert_v3.0-Project-Annual-Report-Zhengbang Hubei-GS11333.docx
- Final ER-Zhengbang Hubei-1st-V02-CTI-Clean.xlsx
- 20230308_GS4GG Final VER Report_Zhengbang Hubei Swine 1st_clean.pdf
- SDG-Impact-Tool-zhengbang Hubei-1st-V02-CTI-Clean.xlsx
- 04 ER-Swine Farm AWMS GHG Mitigation Project in Hubei Province.xls
- Annual Report-Zhengbang Hubei-GS11333.docx
- +2 more
Other
pdd
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →