Skip to main content
GSBiogas - ElectricityChinaACM0010

Xinwufeng AMMS GHG Mitigation Project in Hunan Province

GS-3913 ↗ · current registry ID: GS12073

#54of 268 in Biogas#469of 1084 in China#549of 1801 in Gold Standard (GS)#20of 66 in ACM0010

5.3/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The Xinwufeng biogas-to-electricity project has a solid additionality foundation (combined test, VVB-verified, capture not legally required) and reasonable first-period delivery at roughly 84% of the pro-rata expectation. However, the verification report flagged six material findings and twenty corrective actions, the leakage treatment is ambiguous (contradicted between the PDD and verification report), and several key MRV parameters (FNRB, usage rates, feedstock sustainability) are absent from the extracted record, limiting confidence in the credit's robustness.

Red Flags

  • Six material findings in the verification report, including an incorrect MCFj value, an incorrect electricity consumption figure, and an incorrect project emission calculation, all requiring corrective action before the MR is accepted.
  • Leakage treatment is contradictory: the PDD (Sep 2024) describes leakage as 'deemed negligible' while the verification report (Oct 2024) labels it 'quantified,' yet no specific deduction percentage is stated in either document.
  • Twenty corrective actions were required across the PDD and MR, spanning IPCC version updates, missing financial indicators for NPV, incorrect baseline emission factor sources, and incomplete milestone tables, indicating substantial quality-control gaps in the project documentation.

Credit Vintages

IssuedRetiredAvailable
2022
37,40617,73219,674
2023
118,3946,308112,086
Total155,80024,040131,760

Risk Indicators

Additionality

VVB-confirmed combined test; capture not legally required

Permanence

Biogas project – no carbon-stock reversal risk

Leakage

Contradictory treatment (quantified vs negligible); no specific % stated

Baseline

Project-specific, modeled; no reassessment date stated

Safeguards

FPIC conducted, grievance mechanism present, benefit sharing described

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10ACM0010

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents