Shangrao Swine Farm Animal Manure Management System GHG Mitigation Project
GS-3228 ↗ · current registry ID: GS11239
#178of 268 in Biogas#895of 1084 in China#1354of 1801 in Gold Standard (GS)#54of 66 in ACM0010
Audit Analysis
A Gold Standard biogas-to-electricity project on a swine farm in China with confirmed additionality and in-place safeguards, but undermined by 15 corrective actions flagging widespread monitoring and data-quality gaps, a project-specific modeled baseline with no stated buffer pool, and a 26% downward revision of the verified ERR between two verification reports. The project delivered roughly 137% of its pro-rata expectation for the five-month monitoring window, which is encouraging, but the volume of unresolved monitoring deficiencies casts doubt on the reliability of the underlying data.
Red Flags
- 15 corrective actions required in the verification report (2023-03-31), spanning missing cross-checks, uncalibrated meters, unrecorded emergency procedures, and parameters not monitored as specified in the PDD
- Verified ERR revised downward from 334,691 tCO₂e (verification report, 2022-12-20) to 245,755 tCO₂e (verification report, 2023-03-31), a 26% reduction indicating the initial verification was too generous
- Leakage deduction percentage not stated despite the justification being labelled 'quantified'; the actual figure is absent from the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 68,059 | 7,736 | 60,323 | |
| 2021 | 317,574 | 101,097 | 216,477 | |
| 2022 | 194,813 | 42,749 | 152,064 | |
| Total | 580,446 | 151,582 | 428,864 |
Risk Indicators
VVB-confirmed combined test
reversal risk unquantified
Labelled quantified but percentage absent
Project-specific, modelled; reassessment timing not stated
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →