Tieqilishi AWMS GHG Mitigation Project in Guizhou Province
GS-3645 ↗ · current registry ID: GS11720
#51of 268 in Biogas#467of 1084 in China#536of 1801 in Gold Standard (GS)#19of 66 in ACM0010
Audit Analysis
A Gold Standard biogas-to-electricity project in Guizhou, China, with a VVB-confirmed combined additionality test and a well-matched claimed-to-verified ERR figure for the first monitoring period. However, the project-specific modeled baseline, absence of a stated buffer pool, seven corrective action requests (including calculation errors in MCFj and ECPJ), and several missing monitoring parameters (FNRB, usage rate, leakage percentage) limit confidence in the robustness of the credit.
Red Flags
- Seven corrective action requests in the verification report, including an incorrect MCFj value (not based on actual temperature) and an incorrect ECPJ total, indicating calculation errors in the first monitoring period
- Leakage is described as 'quantified' in the justification but the actual deduction percentage is not found in the extracted record
- FNRB value and method, usage rate (assumed and verified), and usage monitoring method are all absent from the available documents
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test; capture not legally required
no reversal events reported but risk unquantified
Described as quantified but deduction percentage not found in record
Project-specific and modeled; no reassessment date stated
FPIC conducted; grievance mechanism and benefit sharing documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →