Vai al contenuto principale
VCS Energy industries (renewable/non-renewable sources) China Registry: Registered Documentazione completa General Methodology v2.0

Yantai Xinhao Swine Farm Manure Management System GHG Mitigation Project

VCS-3164 ↗

7.4 / 10
Integrity
7.2
Transparency
7.8
Claim Safety
6.4
Documentation
8.6

Score Breakdown

Integrity

verified VVB confirmed replacement of uncovered lagoon with closed anaerobic digester under ACM0010 [Verification Report, 26-Jul-2023]

inferred Leakage is stated as included in the ER calculation, but the exact deduction method is not shown in the excerpt [Verification Report]

Transparency

verified Public validation/verification report, monitoring report, and project description are available from the registry package

verified Report includes site visit dates, interviews, and appendix references, supporting audit traceability [Verification Report]

Claim Safety

verified VCS-registered project with no evidence of other GHG program registration or other environmental credits [Verification Report]

inferred No CCP/Article 6/corresponding-adjustment evidence shown; monitoring period is 2021-2022, limiting current-year claim strength

Documentation

verified 120-page joint validation and 1st verification report issued 26-Jul-2023 [Verification Report]

verified Monitoring report and project description are publicly referenced in the official registry package

Detailed Analysis

Integrity

The verification report (CTI, report ID 2022-0316, issued 26-Jul-2023) confirms the project replaced an uncovered anaerobic lagoon with a closed anaerobic digester/UASB system and that the baseline scenario was the pre-project lagoon. Additionality was assessed during validation under ACM0010 v08.0, but the excerpt does not show the full investment/barrier analysis, so I score this as solid but not best-in-class. Leakage is stated to be included in the ER calculation, which is positive, and the project is not an AFOLU permanence-heavy activity, so permanence risk is lower than for forestry projects. The main integrity limitation is that the report excerpt does not expose the detailed additionality evidence or the exact leakage deduction methodology.

Transparency

Publicly accessible official documents are present in the registry package: a joint validation and 1st verification report, a monitoring report, and the project description/PDD text extract. The verification report is detailed and includes site visit dates, document review, interviews, and appendix references, which supports good transparency. However, the excerpt does not show the full monitoring report contents or the registry issuance/retirement history, so transparency is strong but not perfect. The project is clearly findable on VCS and the documentation is more than marketplace metadata.

Claim Safety

The project is registered under VCS, but the evidence provided does not indicate CCP approval, Article 6 authorization, or a corresponding adjustment, so buyer claim strength is limited to standard VCM claims. The first monitoring period covers 05-Mar-2021 to 30-Jun-2022, and the verification was issued in July 2023, so the vintage is not current-year and is somewhat dated for a present-day offset claim. The report says the project is not registered under other GHG programs and no other environmental credits were created, which reduces double-registration concern. A buyer could credibly claim support for methane reduction from manure management, but not a high-assurance compliance-style climate claim.

Documentation

The evidence package includes a public verification report, validation report, monitoring report, and project description, all referenced from the official registry. The verification report is substantial (120 pages) and includes methodology, site visit, findings, and appendix references, which is strong documentation quality. The main gap is that the excerpt does not provide the full monitoring report tables or the registry issuance/retirement record, and the documents are from 2023 rather than recent ongoing monitoring. Overall, documentation is robust enough for a registry-grade assessment.

Overall

Overall, this is a reasonably well-documented VCS manure-management project with independent verification and a clear baseline replacement story, which supports a good but not exceptional score. The biggest positive is the third-party verification of the installed AWMS and the inclusion of leakage in the calculation; the biggest limitation is that the excerpt does not fully expose the additionality test or the detailed monitoring evidence. Evidence scope is registry_grade, so confidence is high. The project looks materially stronger than a marketplace-only listing, but claim safety is held back by vintage age and the lack of any explicit high-integrity claim label.

Audit Analysis

This is a registry-grade VCS project with a public validation/verification report, monitoring report, and project description, so confidence is relatively high. The main strength is that a third-party verifier audited the project and confirmed the manure-management system, but claim safety is moderated by the project’s 2021-2022 vintage and the absence of any explicit CCP/Article 6/corresponding-adjustment signal.

Project Description

Proponent: Yantai Xinhao agriculture and animal husbandry Co., Ltd. Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0010 Estimated annual GHG reductions: 92011 tCO2e Region: Asia Registration date: 2023-08-30

Red Flags

  • Vintage is based on a 2021-2022 monitoring period and 2023 verification, which is dated for a current offset claim.
  • The excerpt does not disclose the full additionality test results, so the strength of the investment/barrier analysis cannot be independently checked here.

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Publish the full monitoring report tables showing manure volumes, biogas flow, operating hours, and leakage deductions for the verified period.
  • Disclose the complete additionality demonstration, including investment analysis inputs, benchmark assumptions, and any barrier/common-practice evidence used under ACM0010.
  • Add registry-level retirement/issuance history and any buyer claim guidance, including whether any corresponding adjustment or Article 6 authorization exists.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

documented evidence

Permanence

documented evidence

Leakage

mixed evidence / unresolved risk

Baseline

documented evidence

Safeguards

documented evidence

Double-claim

mixed evidence / unresolved risk

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-08 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti