Shuangbaotai AWMS GHG Mitigation Project in Jiangsu Province
#466of 1084 in China#554of 1339 in Verra (VCS)#18of 66 in ACM0010
Audit Analysis
The Shuangbaotai anaerobic wastewater treatment project (ACM0010) has VVB-confirmed additionality and no reversal events, but is undermined by four corrective action requests, a project-specific modeled baseline, and a low extraction confidence rating across the document set. The project delivered roughly 79% of its pro-rata lifetime expectation for the 2022 monitoring year, indicating no over-crediting. Several key parameters (buffer pool percentage, leakage deduction rate, FPIC status, CORSIA/CCP eligibility) are absent from the extracted record, limiting confidence in the full compliance picture.
Red Flags
- Four corrective action requests (CAR 01–04) and three compliance-level findings (CL 01–03) were raised during verification, including inconsistent reporting of the monitored parameter Vt,db — indicating recurring data-quality issues in the project's MRV reporting.
- Minimum extraction confidence across the 19-document set is rated low, meaning at least one key document was poorly readable and critical parameters (buffer pool %, leakage deduction %, grid EF year, FPIC) could not be confirmed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 69,003 | 0 | 69,003 | |
| 2021 | 117,238 | 117,238 | 0 | |
| 2022 | 247 | 247 | 0 | |
| Total | 186,488 | 117,485 | 69,003 |
Risk Indicators
VVB-confirmed combined test
No reversals
Quantified per 2023 VR; % not in record
Project-specific, modeled; reassessment not yet due
Grievance mechanism present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →