Shangcai Xima Biogas Recovery and Utilization Project
#161of 268 in Biogas#854of 1084 in China#967of 1339 in Verra (VCS)#51of 66 in ACM0010
Audit Analysis
The Shangcai Xima biogas project has a VVB-confirmed additionality assessment and a registered status under VCS, but the verification report identifies 12 material findings and 4 corrective action requests related to monitoring gaps, outdated IPCC guidelines, and missing calculation elements. The project delivered its claimed 159,234 tCO₂e for the 2022–2023 monitoring period, yet the underlying data quality concerns and low extraction confidence across 16 documents limit confidence in the robustness of the credit claims.
Red Flags
- 12 material findings in the 2024 verification report, including missing flaring emission discount, use of 2006 IPCC Guidelines instead of the required 2019 Refinement, and missing monitored parameters
- 4 Corrective Action Requests raised during verification, indicating systemic gaps in monitoring and reporting
- Leakage is described as 'quantified' in the justification but the actual deduction percentage is not stated in any available document
- Low extraction confidence across the document set, suggesting at least one key document was poorly readable or incomplete
- Contradiction between the verification report (FPIC conducted) and the monitoring report (FPIC not conducted) for the same reporting period
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
biogas has lower reversal risk but no
Described as quantified but actual deduction percentage not
Project-specific modeled baseline; reassessment not yet due
Grievance mechanism present and safeguards mentioned, but FP
CORSIA and CCP statuses not stated in available documents; d
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →