Baoshan East Hope Swine Farm AWMS GHG Mitigation Project
Score Breakdown
Integrity
verified Additionality was confirmed by CTI Certification Co., Ltd. in the validation report, which is stronger than the earlier PDD position.
missing Leakage is marked as not addressed in the validation report, and no buffer pool or reversal treatment is stated.
Transparency
verified The project has a named VVB and a recent validation report dated 2026-01-18, with nine extracted documents used overall.
missing Monitoring period, verified emission reductions, and usage monitoring details are not stated in the extracted record.
Claim Safety
verified The project is not described as CORSIA-eligible or CCP-approved in the available record, so dual-claim risk is not elevated on the evidence provided.
missing The baseline is project-specific rather than clearly standardized or recently reassessed, and leakage treatment is unclear.
Documentation
verified The record includes both a PDD and a validation report, plus safeguards such as FPIC and a grievance mechanism.
missing Extraction confidence is only medium, one document is listed as unknown, and there are contradictions on additionality, leakage, and the crediting period.
Detailed Analysis
Integrity
The validation report confirms additionality through a common-practice test and states that CTI Certification Co., Ltd. verified it, which supports the project. However, leakage is not addressed in the validation report, buffer pool coverage is not found, and reversal treatment is not stated, which weakens permanence and leakage robustness.
Transparency
Transparency is constrained because the extracted record does not state the monitoring period, verified emission reductions, or usage monitoring method. The presence of a named VVB and a recent validation report helps, but the missing quantitative MRV details leave the public evidence base incomplete.
Claim Safety
Claim safety is only moderate because the project uses a project baseline and leakage is not addressed in the validation report. The record does not state CORSIA eligibility or CCP approval, so there is no direct evidence of dual-claim exposure, but the absence of clear eligibility information limits confidence.
Documentation
Documentation is mixed: there are multiple official documents, a recent validation report, and safeguards such as FPIC and a grievance mechanism. Still, extraction confidence is only medium, one source is listed as unknown, and the record contains contradictions on additionality, leakage, and the crediting period, which lowers reliability.
Overall
I privileged the validation report over the earlier PDD because it is the later, VVB-reviewed document and therefore the higher-priority source for final project status. That said, the contradictions matter: the validation report says additionality is confirmed while the PDD said otherwise, it leaves leakage not addressed while the PDD reportedly quantified it, and it shifts the crediting period by two months; these inconsistencies reduce confidence and pull scores down. Because documentation is incomplete and key MRV fields are missing, the overall assessment remains cautious.
Audit Analysis
The project has some positive integrity signals, including VVB-confirmed additionality and documented safeguards, but key risk controls are weakly evidenced. Transparency is limited by missing monitoring and issuance data, and the record contains contradictions that reduce confidence in the extracted facts.
Project Description
Proponent: Baoshan East Hope Animal Husbandry Co., Ltd. Protocol categories: Livestock, enteric fermentation, and manure management; Waste handling and disposal Protocols: ACM0010 Estimated annual GHG reductions: 49328 tCO2e Region: Asia Registration date: 2026-02-11
Red Flags
- Leakage is not addressed in the validation report, despite the PDD reportedly treating it differently.
- The crediting period and additionality conclusions differ between the PDD and the validation report, creating reliability concerns.
Credit Vintages
Nessuna emissione registrata sul registro.
Cosa migliorerebbe questo punteggio
- Publish the monitoring report and verified issuance figures, including the monitoring period and any usage monitoring method.
- Resolve the contradictions between the PDD and validation report, especially on additionality, leakage treatment, and the crediting period.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed common-practice test
No buffer or reversal treatment stated
Leakage not addressed in final validation
Project baseline without reassessment evidence
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →