BEYLIKOVA BIOGAS POWER PLANT
#34of 111 in Biogas#86of 121 in Turkey#361of 629 in Verra (VCS)#10of 17 in ACM0010
Audit Analysis
The Beylikova Biogas Power Plant is a VCS-registered energy/waste project in Turkey with confirmed additionality via an investment test and no permanence risk (non-AFOLU). However, a 0% leakage deduction for a biogas facility, a project-specific modeled baseline, and the absence of any monitoring-period data limit confidence in the credit claims. Seven cross-document contradictions and low extraction confidence further reduce assurance.
Red Flags
- 0% leakage deduction for a biogas plant where methane slip from digesters and storage is a well-known emission pathway; the validation report labels the justification 'quantified' but the PDD called it 'deemed negligible', and no quantified figure is provided in the extracted record
- Crediting period end date is not stated in the validation report (only start date 2021-02-01), while the PDD lists 2030-09-03; the discrepancy is unresolved in the available documents
- Seven contradictions across documents (FPIC, additionality test type, additionality verification, ERR figure, benefit sharing, leakage justification, crediting period) indicate inconsistent project documentation
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable, reducing reliability of the extracted facts
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test confirmed by VVB
Non-AFOLU; no reversal risk
0% deduction; justification inconsistent across docs
Project-specific, modeled; no reassessment date
FPIC and grievance mechanism present but contradicted in PDD
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →