Dekang AWMS GHG Mitigation Project in Guizhou Province
#28of 66 in Soil carbon#136of 204 in China#436of 629 in Verra (VCS)#13of 17 in ACM0010
Audit Analysis
The Dekang AWMS project in Guizhou is a registered VCS anaerobic digestion project (ACM0010) with VVB-confirmed additionality via an investment test, but suffers from significant documentation contradictions across six fields, an unquantified leakage deduction, and an unaddressed permanence risk. The discrepancy between the PDD's ex-ante estimate (427,200 tCO2e) and the monitoring report's verified figure (537,393 tCO2e) raises over-crediting concerns that cannot be fully resolved from the available data. Overall, the project meets minimum VCS registration requirements but exhibits moderate-to-high data reliability risks.
Red Flags
- Six contradictions between documents, including FPIC (verification report says not conducted; monitoring report says conducted), grievance mechanism, safeguards, and benefit sharing — all resolved in favor of the later verification report (2022-09-01) indicating these were NOT in place
- PDD ex-ante estimate of 427,200 tCO2e is 20% lower than the 537,393 tCO2e reported in the monitoring report; the basis (lifetime vs. period) is ambiguous, creating over-crediting uncertainty
- Permanence risk is listed in the verification report table of contents but the specific content was not extractable; no buffer pool percentage is stated and reversal events are marked as not addressed
- Leakage is described as 'quantified' in the justification field, yet no specific deduction percentage appears in any extracted document
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Risk section present but content not extractable; no buffer
Described as quantified but no percentage found in any docum
Project-specific modeled baseline; reassessment not yet due
FPIC not conducted; no grievance mechanism; no benefit shari
CORSIA-ineligible confirmed; CCP status not stated but no du
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →