Gansu Hui County Muge Swine Farm Manure Management System GHG Mitigation Project
#168of 1084 in China#221of 1339 in Verra (VCS)#5of 66 in ACM0010
Audit Analysis
A VCS-registered biogas project from swine manure in Gansu, China, with a VVB-confirmed investment additionality test and a consistent first-period verification of 58,604 tCO₂e. Key gaps include unaddressed reversal risk, an unstated buffer pool percentage, and a project-specific modeled baseline, which collectively moderate the integrity and claim-safety scores. No over-crediting is evident, as the verified figure represents roughly 82% of the pro-rata lifetime expectation for the elapsed monitoring period.
Red Flags
- Reversal events are marked as 'not addressed' in the verification record, leaving permanence risk for the biogas system unquantified
- FPIC (Free, Prior and Informed Consent) is not documented as conducted, despite the project operating in a Hui ethnic minority county
- Leakage is described as 'quantified' in the justification, yet the actual deduction percentage is absent from the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 20,625 | 0 | 20,625 | |
| 2022 | 35,097 | 0 | 35,097 | |
| 2023 | 2,882 | 0 | 2,882 | |
| Total | 58,604 | 0 | 58,604 |
Risk Indicators
VVB-confirmed investment test
Reversal risk unaddressed
Quantified per justification but deduction % not in record
Project-specific, modeled; not yet due for reassessment
Grievance mechanism present; FPIC not documented
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →