Skip to main content
VCSLivestock, enteric fermentation, and manure management; Waste handling and disposalChina Registry: RegisteredACM0010

Qingfeng Biogas Recovery and Utilization Project

VCS-3126 ↗

#100of 268 in Biogas#647of 1084 in China#726of 1339 in Verra (VCS)#34of 66 in ACM0010

5.0/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

The Qingfeng Biogas project (VCS-3126) has a VVB-verified additionality assessment and no reported reversals, but the verification report lists ten material findings covering missing equations, incorrect sectoral scope, and absent monitored parameters, yet no corrective actions were required. The project delivered roughly 75% of its pro-rata ex-ante expectation for the elapsed monitoring period, which is conservative but the three cross-document contradictions—particularly the ten-fold gap between the PDD lifetime estimate and the monitoring-period figure—undermine confidence in the data chain. Buffer pool, leakage deduction percentage, and CORSIA/CCP status are all unstated, leaving key permanence and double-claiming questions open.

Red Flags

  • Ten material findings in the verification report (missing heat-generation equation, incorrect sectoral scope, missing NEXLT and N2O option justifications, absent boiler-efficiency validation, missing flaring discount) yet zero corrective actions were recorded, creating an unexplained gap between identified deficiencies and remediation.
  • The PDD states a lifetime ex-ante estimate of 1,143,690 tCO₂e while the monitoring report claims only 110,788 tCO₂e for the period; although these are on different bases, the ten-fold gap and the absence of a clear reconciliation in the extracted record raise data-reliability concerns.
  • FPIC is reported as conducted in the verification report but not conducted in the monitoring report (both dated 2025-01-20), a direct contradiction on a fundamental safeguard requirement.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

Quantified justification but deduction % absent

Baseline

Project-specific, modelled; reassessment not yet due

Safeguards

FPIC contradiction; grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0010

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents