CARBONO OXIGENO PARA TODOS
#57of 124 in Colombia#46of 99 in CerCarbono (CC)
Audit Analysis
A Colombian forestation/reforestation project (2009–2028) verified by ICONTEC with a 15% buffer pool and no reported reversals, but undermined by a 0% leakage deduction with no justification, absence of FPIC, and 16 material findings spanning missing safeguards sections, un-updated ex-ante quantification, and unverifiable technical parameters. The verified ERR (34,261 t) is conservative relative to the claimed figure (40,307 t), yet the project delivered roughly 2.9× the pro-rata expectation for the elapsed monitoring period, a pattern consistent with accelerating forest growth but one that warrants scrutiny given the un-updated ex-ante baseline.
Red Flags
- Leakage deduction of 0% with justification recorded as 'not addressed' in the verification report, despite the project involving active plantation management with harvests and thinning
- FPIC explicitly not conducted (false) for a project operating on multiple parcels in Normandía, La Cascada, Escandinavia, Lepanto, and Patagonia, with no grievance mechanism documented
- 16 material findings in the verification report, including missing safeguards and stakeholder-consultation sections in the monitoring report, ICA registration gaps, area discrepancies between inventory and cartography, and ex-ante quantification not updated to reflect second/third rotation harvests
- Contradiction in verified ERR between two issuance documents (34,261 t on 2026-01-27 vs 40,307 t on 2026-01-19), creating ambiguity about the actual credit quantity issued
- Crediting period start date differs between the verification report (2009-01-06) and the validation report (2009-06-01), a 5-month discrepancy that affects pro-rata calculations
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 5 | 0 | 5 | |
| 2011 | 68 | 0 | 68 | |
| 2012 | 173 | 0 | 173 | |
| 2013 | 1,028 | 0 | 1,028 | |
| 2014 | 1,869 | 0 | 1,869 | |
| 2015 | 2,568 | 0 | 2,568 | |
| 2016 | 2,823 | 0 | 2,823 | |
| 2017 | 2,853 | 0 | 2,853 | |
| 2018 | 2,655 | 0 | 2,655 | |
| 2019 | 2,570 | 0 | 2,570 | |
| 2020 | 7,076 | 0 | 7,076 | |
| 2021 | 1,012 | 0 | 1,012 | |
| 2022 | 2,036 | 0 | 2,036 | |
| 2023 | 2,036 | 0 | 2,036 | |
| 2024 | 962 | 0 | 962 | |
| Total | 29,734 | 0 | 29,734 |
Risk Indicators
VVB-confirmed but test type not stated
mixed evidence / unresolved risk
0% deduction, justification not addressed per VVB
Project-specific, reassessed 2021
FPIC not conducted, no grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →