Wheatbelt Biodiversity Carbon Credit Project
#113of 261 in Soil carbon#6of 14 in Australia#820of 1339 in Verra (VCS)#42of 97 in AR-ACM0003
Audit Analysis
The Wheatbelt Biodiversity Carbon Credit Project is a VCS AFOLU soil-carbon project in Australia with a VVB-verified combined additionality test, a 10% buffer pool, and no reported reversal events. However, the project-specific baseline, non-permanence risk sitting at the minimum required threshold, the absence of any monitoring-period data, and a low extraction confidence across nine documents limit confidence in the credit's robustness. Multiple contradictions between the PDD and validation report—particularly on FPIC, grievance mechanism, leakage justification, and the total ERR—introduce data-reliability concerns that temper the otherwise reasonable design.
Red Flags
- Non-permanence risk rating is 10, the absolute minimum required by the AFOLU Non-Permanence Risk Tool, leaving no margin for additional risk
- No monitoring period or monitoring report was found in the extracted record, so verified emissions reductions cannot be independently cross-checked against a pro-rata expectation
- Ten Corrective Action Requests were raised during validation (eligibility criteria #7 and #8 were internally contradictory, and the Common Practice Analysis omitted non-carbon A/R projects in Australia), indicating material design weaknesses that had to be remediated
- min_extraction_confidence is rated 'low', meaning at least one key document was poorly readable and the extracted facts may be incomplete
- The PDD (2022-09-02) and the validation report (2024-04-19) disagree on FPIC status, grievance mechanism presence, leakage justification, and the total ERR (93,985 vs 55,135), creating uncertainty about which values are authoritative
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified combined test
Buffer pool present but risk at minimum threshold (10)
0% deduction, quantified per validation but PDD said negligi
Project-specific; reassessment not yet due under VCS 10-yr r
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →