Eastern Cape Restoration Project, South Africa - Somerset East
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, TÜV NORD CERT GmbH, in the 2024 validation report.
missing The baseline method is not found in the extracted record, and reversal risk is marked as not addressed.
Transparency
verified The project has a recent validation report dated 2024-12-12 and a clearly stated monitoring period running from 2023-10-01 to 2063-09-30.
missing Verified and claimed ERR totals are not stated, and the extraction confidence is low, limiting confidence in the public record.
Claim Safety
verified The 2024 validation report says leakage is deemed negligible, which is better than an unaddressed leakage claim.
missing The baseline method, verified usage data, and CORSIA/CCP status are not stated, leaving over-crediting and double-claim risk unresolved.
Documentation
verified The record includes a named VVB, a recent validation date, and evidence of safeguards such as FPIC, benefit sharing, and a grievance mechanism.
missing The extracted evidence list is sparse, the extraction confidence is low, and there are unresolved contradictions across documents.
Detailed Analysis
Integrity
The validation report from 2024-12-12 confirms additionality through the VVB, which supports the project’s core integrity case. But the baseline method is not found in the extracted record, reversal events are marked as not addressed, and there is no buffer pool information, so permanence and baseline robustness remain only partially supported. The leakage treatment is described as deemed negligible in the 2024 validation report, but the lack of quantified leakage deduction still limits confidence.
Transparency
Transparency is mixed because the project has a named verifier, TÜV NORD CERT GmbH, and a clearly stated monitoring period and crediting period. However, the extracted record does not state verified or claimed ERR totals, usage monitoring method, or baseline reassessment timing, which limits MRV traceability. The low extraction confidence further reduces confidence that the available documentation is complete.
Claim Safety
Claim safety is weakened by missing baseline detail and the absence of verified usage-rate information, both of which matter for over-crediting risk in a soil carbon project. The 2024 validation report’s statement that leakage is deemed negligible is helpful, but it is not backed here by a quantified deduction. CORSIA eligibility and CCP status are not stated, so dual-claim risk cannot be ruled out from the extracted record.
Documentation
Documentation quality is only moderate because the record includes a recent validation report, a named VVB, and safeguards such as FPIC, benefit sharing, and a grievance mechanism. At the same time, the evidence list is sparse, the extraction confidence is low, and key fields such as baseline method and ERR totals are missing. The contradiction between the 2022 and 2024 documents on leakage treatment and the crediting period also lowers confidence in the documentation set.
Overall
Overall, I privileged the 2024 validation report over the older 2022 document because it is more recent and should reflect the latest validated project status. On the leakage issue, I used the 2024 statement that leakage is deemed negligible, but I still discounted the score because the earlier document reportedly said leakage was not addressed, creating a reliability concern. I also privileged the 2024 crediting period for the same reason, but the contradiction itself reduces confidence and keeps the overall score in the mid range.
Audit Analysis
The project has some positive signs, including VVB-confirmed additionality, a recent validation report, and documented safeguards such as FPIC and a grievance mechanism. However, key baseline, leakage, and crediting details are incomplete or inconsistent, and the low extraction confidence reduces trust in the record.
Project Description
Proponent: EcoPlanet Bamboo Group, LLC Protocol categories: Agriculture Forestry and Other Land Use Protocols: AR-ACM0003 Estimated annual GHG reductions: 218083 tCO2e Region: Africa Registration date: 2025-02-14
Red Flags
- The baseline method is not stated in the extracted record, which weakens confidence in the emissions claim.
- There is a contradiction on leakage treatment and the crediting period between the 2022 and 2024 documents, indicating reliability issues.
Credit Vintages
Nessuna emissione registrata sul registro.
Cosa migliorerebbe questo punteggio
- Publish the baseline method, leakage calculation, and verified ERR totals in a complete monitoring package.
- Resolve the document contradictions by issuing a reconciled statement on the crediting period and leakage treatment, with clear version control.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No reversal evidence, but risk not addressed
Negligible claim without quantified deduction
Baseline method not stated
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →