Skip to main content
VCSAgriculture Forestry and Other Land UseSouth Africa Registry: RegisteredAR-ACM0003

Eastern Cape Restoration Project, South Africa - Makhanda

VCS-3627 ↗

#44of 66 in Soil carbon#10of 12 in South Africa#544of 629 in Verra (VCS)#19of 26 in AR-ACM0003

4.3/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
4.0
Documentation
4.0

Audit Analysis

The Eastern Cape Restoration Project is a VCS soil-carbon project validated by TÜV NORD CERT with a confirmed combined additionality test and a 13% buffer pool, but it carries significant concerns: the validated ERR (688,461 tCO₂e) is only ~13% of the PDD's original estimate (5,430,909 tCO₂e), 12 material findings and 3 corrective actions were raised during validation, FPIC was not conducted, and a 0% leakage deduction was applied to a soil-carbon project. The low extraction confidence and several missing data points further limit confidence in the project's overall robustness.

Red Flags

  • The PDD (2022) estimated 5,430,909 tCO₂e in lifetime removals, but the validation report (2025) approved only 688,461 tCO₂e — an 87% reduction that signals the initial design was substantially over-estimated.
  • Free, Prior and Informed Consent (FPIC) was not conducted despite the project involving local communities in South Africa; only a grievance mechanism and general safeguards are documented.
  • A 0% leakage deduction was applied to a soil-carbon project, justified as 'deemed negligible' in the validation report, while an appendix document apparently described the leakage as 'quantified' — an unresolved contradiction.
  • Twelve material findings and three corrective actions were raised during validation, including inconsistencies in baseline pools, project boundary maps, soil-type assessment, and transparency of carbon-calculation inputs.
  • Minimum extraction confidence across the document set is rated 'low', and one document in the evidence list is typed as 'unknown', limiting assurance over the completeness of the record.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test confirmed by VVB

Permanence

13% buffer, no reversals, but soil-carbon vulnerability

Leakage

0% deduction, deemed negligible, contradictory appendix

Baseline

Project-specific; reassessment not yet due (10-yr VCS rule)

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AR-ACM0003

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents