Skip to main content
VCSAgriculture Forestry and Other Land UseParaguay Registry: RegisteredGeneral Methodologyv2.1

The Paraguayan Chaco Neem Reforestation Project

VCS-2744 ↗

#156of 261 in Soil carbon#5of 8 in Paraguay#1022of 1339 in Verra (VCS)

4.5/ 10
Integrity
3.5
Transparency
5.5
Claim Safety
4.5
Documentation
5.0

Audit Analysis

The Paraguayan Chaco Neem Reforestation Project is a VCS-registered AFOLU project with a 30-year crediting period, verified by EcoLance. While the project benefits from a 20% buffer pool and VVB-confirmed additionality, it carries 14 material findings and 14 corrective actions, including insufficient evidence for the zero-leakage assumption, questioned investment-barrier analysis, and a lack of FPIC. The project is under-delivering relative to its ex-ante estimate (9,148 vs 11,072 tCO2e), which is conservative, but the overall documentation and safeguards picture is weak.

Red Flags

  • 14 material findings and 14 corrective actions identified in the verification report, including insufficient evidence for the zero-leakage assumption and inadequate investment-barrier justification in the additionality analysis
  • FPIC was not conducted despite the project operating in the Paraguayan Chaco, a region with significant indigenous and local community presence
  • Leakage deduction of 0% is justified as 'not addressed' in the verification report, while the monitoring report claims it was 'deemed negligible' — a direct contradiction with no supporting evidence in either document
  • Contradiction on reversal events: an earlier verification report (June 2025) reported reversal events, while the later one (August 2025) states none; the material findings reference heightened seedling mortality from drought and cold, suggesting the risk was real but may have been reclassified
  • Buffer pool percentage differs between the PDD (11%) and the monitoring report (20%), with no documented explanation for the change

Credit Vintages

IssuedRetiredAvailable
2020
6230623
2021
1,94201,942
2022
3,29403,294
2023
1,46001,460
Total7,31907,319

Risk Indicators

Additionality

VVB-confirmed but investment-barrier evidence questioned

Permanence

20% buffer pool, no reversals in latest report, but drought

Leakage

0% deduction with no supporting evidence per verification re

Baseline

Project-specific baseline, no reassessment date recorded

Safeguards

Grievance mechanism present, but FPIC not conducted and AFOL

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents