REGENERATING DEGRADED LANDS IN FLORIDA THROUGH PONGAMIA
#109of 261 in Soil carbon#192of 345 in United States#811of 1339 in Verra (VCS)
Audit Analysis
This VCS ALM project in Florida aims to regenerate degraded land using Pongamia, a nitrogen-fixing tree, and benefits from a 29% buffer pool and no reported reversals. However, the project delivered only about 20% of its pro-rata ex-ante expectation for the elapsed monitoring period, the leakage justification is weak (0% deduction, 'deemed negligible'), and the verification process generated an unusually high number of corrective actions (69 CARs, 29 ADRs, 40 CRs). Multiple contradictions across documents—particularly on FPIC status, additionality test type, and verified ERR figures—undermine confidence in the data record.
Red Flags
- Verified ERR of 4,643 tCO2e represents only ~20% of the pro-rata expectation (~23,300 tCO2e) for the 5.4-year monitoring period against the PDD lifetime estimate of 86,798 tCO2e, suggesting the ex-ante baseline may be overly optimistic
- 69 Corrective Action Requests, 29 Additional Documentation Requests, and 40 Clarification Requests indicate significant and persistent compliance and documentation deficiencies
- FPIC status is contradictory: the monitoring report (June 2025) states FPIC was not conducted, while the validation report (December 2025) states it was conducted
- Leakage deduction of 0% with a 'deemed negligible' justification is weak for a soil-carbon project where land-use change and management shifts can displace emissions
- Verified ERR discrepancy of 44% between the validation report (4,643) and the monitoring report (3,296) raises data-reliability concerns
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 16 | 0 | 16 | |
| 2019 | 210 | 0 | 210 | |
| 2020 | 509 | 0 | 509 | |
| 2021 | 743 | 0 | 743 | |
| 2022 | 853 | 0 | 853 | |
| 2023 | 944 | 0 | 944 | |
| 2024 | 21 | 0 | 21 | |
| Total | 3,296 | 0 | 3,296 |
Risk Indicators
VVB-confirmed investment test
29% buffer, no reversals
0% deduction, weak justification
Project-specific, not yet due for reassessment
Grievance mechanism present, FPIC contradictory
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →