Skip to main content
VCSAgriculture Forestry and Other Land UseIndia Registry: RegisteredGeneral Methodologyv2.1

Strengthening rural livelihood through carbon finance: Agroforestry practices in Gorakhpur Forest Circle of Uttar Pradesh

VCS-4709 ↗

#183of 261 in Soil carbon#854of 975 in India#1128of 1339 in Verra (VCS)

4.1/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
3.5
Documentation
4.5

Audit Analysis

This agroforestry project in Uttar Pradesh, India has a 21% buffer pool and a quantified 27% leakage deduction, but is undermined by a severe discrepancy in claimed emissions (10,458 vs 1,104,382 tCO₂e across PDD versions), a contradiction on whether reversal events were reported, and the absence of verified monitoring data. The VVB (Carbon Check) confirmed additionality via a barrier test and raised 13 corrective actions, but the overall data reliability is compromised by the conflicting figures across documents.

Red Flags

  • Massive ERR discrepancy: the 2023 PDD claims 1,104,382 tCO₂e lifetime while the 2026 PDD claims 10,458 tCO₂e — a factor of ~106 difference that raises serious questions about which figure is correct and whether credits were issued on the higher basis
  • Reversal events contradiction: the appendix (Oct 2025) reports reversal events, yet the validation report (Feb 2026) states they were 'not addressed', leaving the permanence risk unresolved
  • No verified monitoring-period ERR data is available in the extracted record, making it impossible to confirm actual delivery against the ex-ante estimate
  • FNRB value and method are not stated in any available document, a critical gap for a soil-carbon project under AR-AMS0007
  • 13 Corrective Action Requests were raised during validation, including insufficient non-permanence risk assessment and unclear additionality (regulatory surplus) demonstration

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed barrier test, but PDD originally described a combined test; regulatory surplus assessment flagged as unclear

Permanence

21% buffer pool present, but reversal events reported in appendix and stated as not addressed in validation report

Leakage

27% quantified deduction per validation report (up from 0% in original PDD)

Baseline

Project-specific baseline; FNRB not stated; reassessment not yet due under VCS 10-year rule

Safeguards

FPIC conducted, grievance mechanism in place, benefit sharing described, safeguards documented

Double-claim

CORSIA eligibility not stated; CCP status not mentioned — dual-channel risk cannot be excluded

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents