Skip to main content
VCSAgriculture Forestry and Other Land UseKenya Registry: RegisteredGeneral Methodologyv2.1

Komaza Smallholder Farmer Forestry Kenya

VCS-2623 ↗

#121of 261 in Soil carbon#79of 157 in Kenya#867of 1339 in Verra (VCS)

4.8/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.2

Audit Analysis

The Komaza Smallholder Farmer Forestry project in Kenya is a VCS-registered ALM project with a verified barrier additionality test and a 10% buffer pool, but it is undermined by a 0% leakage deduction with no stated justification, a project-specific baseline, and an extensive list of over 40 material findings and corrective actions identified during verification. The project delivered only about 13% of its pro-rata ex-ante expectation for the four-year monitoring period, which is conservative but raises questions about baseline assumptions. Overall, the project meets minimum VCS requirements but carries moderate integrity and documentation risks.

Red Flags

  • Leakage deduction of 0% with justification listed as 'not addressed' in the most recent verification report (Oct 2027), which is a significant gap for a smallholder forestry project where displaced wood harvesting is a plausible leakage pathway
  • Over 40 material findings and corrective actions were identified during verification, spanning additionality, baseline, permanence, monitoring, and documentation — indicating the initial project documentation was substantially deficient
  • Reversal events are described as 'not addressed' in the most recent verification report (Oct 2027), while an earlier report (Oct 2013) stated 'none reported' — the more recent and authoritative position is that the issue was not explicitly resolved
  • Baseline is project-specific rather than jurisdictional, and the date of last baseline reassessment is not stated in any available document

Credit Vintages

IssuedRetiredAvailable
2017
11,78910011,689
2018
19,786019,786
2019
22,183022,183
2020
22,183022,183
2021
7,39407,394
Total83,33510083,235

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

Buffer pool present; reversal risk not fully addressed

Leakage

0% deduction, justification not addressed

Baseline

Project-specific; reassessment date not stated

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents