Skip to main content
VCSAgriculture Forestry and Other Land UseIndia Registry: RegisteredGeneral Methodologyv2.1

CLIMATE SUSTAINABILITY THROUGH HORTICULTURE PROJECT IN INDIA

VCS-4047 ↗

#173of 261 in Soil carbon#838of 975 in India#1094of 1339 in Verra (VCS)

4.2/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.0
Documentation
4.0

Audit Analysis

A small-scale VCS agroforestry project in Nandurbar, India (214 participants, 108,820 tCO2e lifetime ERR) that passed validation and is registered, but whose validation report carries 27 material findings and 25 corrective actions, a leakage inconsistency (0% deduction despite 5,287 tCO2 quantified), and no monitoring data yet available to verify claims. The project's environmental integrity is plausible but its documentation and verification record remain thin at this stage.

Red Flags

  • Leakage deduction is recorded as 0% while the validation report material findings state leakage was 'later quantified as 5,287 tCO2' — an unexplained inconsistency that could mean ~4.9% of lifetime ERR is not being deducted for leakage
  • 27 material findings and 25 corrective actions in the validation report, including gaps in additionality evidence (regulatory surplus, barriers), insufficient FPIC/human-rights documentation, and unclear timber-harvest activities
  • No monitoring or verification data available (no monitoring period, no verified ERR), so the 108,820 tCO2e lifetime claim is entirely untested against observed performance
  • Invasive species (Gliricidia sepium, Leucaena leucocephala) were part of the plantation plan; a commenter recommended removing Gliricidia in favour of local species, and an SOP for their removal was only added as a corrective action
  • Project longevity was flagged as below the standard's requirement (30 vs 40 years), raising questions about the robustness of the 20-year crediting period

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified combined test, but gaps in regulatory surplus and barrier evidence flagged at validation

Permanence

10% buffer pool in place, no reversal events, but non-permanence risk details sparse

Leakage

0% deduction recorded despite 5,287 tCO2 quantified leakage — unresolved inconsistency

Baseline

Project-specific baseline; no reassessment date recorded (not yet due under VCS 10-year rule)

Safeguards

FPIC and grievance mechanism present, but validation flagged insufficient AFOLU-specific evidence

Double-claim

CORSIA and CCP eligibility both not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents