Additionality: the project must show it with a test. CarbonMeld reads the test in the documents.CM-F-PURO-TSB-ADDITIONALITY
PURO-TSB — Terrestrial Storage of Biomass
About this methodology
Biomass that absorbed carbon dioxide as it grew is placed in a purpose-built terrestrial storage environment that keeps it from decomposing.
- Issued by
- Puro.earth (PUR) · issuer's site
- Version
- 2023.1 · source ·
- Climate outcome
- CO2 removals
- Activity
- Biomass storage
- Official page
- puro.earth ·
How our current method reads projects of this type
Versions of the official text these rules cover: Edition 2023 v.1
What CarbonMeld reads
- Integrity shown
- shown
Durability of the storage: the methodology sets rules for it (TSB 2023, p. 4). CarbonMeld reads it in the project's documents.CM-F-PURO-TSB-DURABILITY-MEASUREMENT
- shown
Sustainability of the feedstock: the methodology sets rules for it. CarbonMeld reads it in the project's documents.CM-F-PURO-TSB-FEEDSTOCK-SUSTAINABILITY
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it in some cases (TSB 2023 leakage, p. 24). Our current method does not assess it.CM-F-PURO-TSB-LEAKAGE
- not assessed
Permanence and reversals: the methodology sets rules for it (TSB 2023 definitions, p. 3). Our current method does not assess it.CM-F-PURO-TSB-PERMANENCE-REVERSAL
- not assessed
No legal requirement for the activity: the methodology sets rules for it. Our current method does not assess it.CM-F-PURO-TSB-REGULATORY-SURPLUS
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it.CM-F-PURO-TSB-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- Grid emission factorCM-N-GRID-EF
- Fraction of non-renewable biomass (fNRB)CM-N-FNRB
- Usage rate of the devicesCM-N-USAGE
- Tracking of the end useCM-N-END-USE-TRACKING
The general rules apply as well. Read the general rules.
Top projects using PURO-TSB
This page ranks projects using PURO-TSB by their CarbonMeld document-based assessment scores. The rank compares project assessments; it is not a rating of the methodology itself.
7 rated projects of the 8 tracked in this methodology · average score 5.5/10 · ranked by CarbonMeld's document-based assessment scores across all four dimensions: integrity, transparency, claim safety and documentation.
7 analysed project pages, A–Z →
- 4 5.4 ▼ -0.4
- 5 5.1 ▼ -0.9
- 6 4.7 ▲ +0.4
- 7 4.2 ▲ +0.5