Fasera TSB Facility 1

PUR-477900 ↗

#15of 196 in Biomass#1of 10 in Australia#3of 109 in Puro.earth (PUR)

6.0/ 10
Integrity
5.8
Transparency
6.2
Claim Safety
6.2
Documentation
5.8

Audit Analysis

Fasera TSB Facility 1 is a biomass storage project in Australia with a confirmed investment additionality test and 100-year storage durability, but it carries notable operational and documentation gaps: six material findings with corresponding corrective actions, an unquantified leakage assessment, and a project-specific baseline without a stated reassessment schedule. The verified ERR slightly exceeds the claimed figure, and CCP approval is in place, but the absence of a buffer pool and several missing MRV parameters temper confidence in the credit's robustness.

Red Flags

  • Six material findings and six corrective actions reported in the December 2025 verification report, including fuel record-keeping gaps, insufficient gas-monitoring equipment, and a missing calibration protocol for the weather station
  • Leakage deduction is not quantified and no justification is provided in any available document, despite leakage being a relevant risk for a biomass storage project
  • No buffer pool percentage is stated in the extracted record, leaving permanence risk unmitigated by a standard mechanism
  • Additionality test type is inconsistent between the PDD (combined test, September 2024) and the verification report (investment test, December 2025)

Credit Vintages Exhausted

IssuedRetiredAvailable
2025
2,1692,1690
Total2,1692,1690

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

100-yr storage, no reversals, no buffer pool

Leakage

Not quantified, no justification stated

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CCP approved, CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents