Skip to main content
PURTerrestrial Storage of BiomassAustraliaGeneral Methodologyv2.0

InterEarth Bowgada

PUR-514150 ↗

#17of 196 in Biomass#2of 10 in Australia#5of 109 in Puro.earth (PUR)

5.9/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.0
Documentation
6.0

Audit Analysis

InterEarth Bowgada is a Puro.earth biomass storage project in Australia with a verified combined additionality test, confirmed 100-year permanence, and exact alignment between claimed and verified ERR (49 tCO₂e). The principal gaps are the complete absence of a documented leakage treatment and a project-specific baseline without a stated reassessment date, which temper an otherwise clean verification record.

Red Flags

  • No leakage deduction or justification is recorded in any available document, despite leakage being a material risk for a biomass storage project where stored material could be diverted or decompose.
  • The baseline is project-specific with no stated reassessment date, limiting confidence that the counterfactual remains valid over the crediting period.
  • One corrective action (gas-monitoring periodicity in the MRV plan) remains open and must be implemented before the next audit.

Credit Vintages Exhausted

IssuedRetiredAvailable
2025
49490
Total49490

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

100-yr storage confirmed, no reversals

Leakage

No deduction or justification found

Baseline

Project-specific, no reassessment date

Safeguards

FPIC done, grievance mechanism not stated

Double-claim

CCP approved; CORSIA not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents